Optimisation of line configuration and balancing for reconfigurable transfer lines considering demand uncertainty
暂无分享,去创建一个
Aiping Li | Xuemei Liu | Jiawei Chen | Jiawei Chen | Xuemei Liu | Aiping Li
[1] Xianzhong Dai,et al. A GA-based approach for optimizing single-part flow-line configurations of RMS , 2011, J. Intell. Manuf..
[2] Hoda A. ElMaraghy,et al. Modelling and optimization of multiple-aspect RMS configurations , 2006 .
[3] Anton V. Eremeev,et al. MIP-based GRASP and Genetic Algorithm for Balancing Transfer Lines , 2010, Matheuristics.
[4] H. Ishibuchi,et al. Multiobjective programming in optimization of the interval objective function , 1990 .
[5] Lei Yue,et al. Automated flexible transfer line design problem: Sequential and reconfigurable stages with parallel machining cells , 2019, Journal of Manufacturing Systems.
[6] Steven Y. Liang,et al. Predictive Modeling of Microgrinding Force Incorporating Phase Transformation Effects , 2019, Journal of Manufacturing Science and Engineering.
[7] G. P. Liu,et al. A nonlinear interval number programming method for uncertain optimization problems , 2008, Eur. J. Oper. Res..
[8] Yoram Koren,et al. The rapid responsiveness of RMS , 2013 .
[9] M. Maniraj,et al. An ant colony optimization–based approach for a single-product flow-line reconfigurable manufacturing systems , 2017 .
[10] Jie Gao,et al. Balancing mixed-model assembly lines using adjacent cross-training in a demand variation environment , 2016, Comput. Oper. Res..
[11] Yoram Koren,et al. Scalability planning for reconfigurable manufacturing systems , 2012 .
[12] Aiping Li,et al. Optimization of line configuration and balancing for flexible machining lines , 2016 .
[13] Alexandre Dolgui,et al. A reactive GRASP and Path Relinking for balancing reconfigurable transfer lines , 2012 .
[14] Jun Lin,et al. Robust multi-market newsvendor models with interval demand data , 2011, Eur. J. Oper. Res..
[15] Yoram Koren,et al. Impact of Manufacturing System Configuration on Performance , 1998 .
[16] Sotiris Makris,et al. Decision making logic for flexible assembly lines reconfiguration , 2016 .
[17] Weida Xu,et al. Strategic robust mixed model assembly line balancing based on scenario planning , 2011 .
[18] Kamal Kumar Mittal,et al. A Systematic Approach for Optimum Configuration Selection in Reconfigurable Manufacturing System , 2018 .
[19] Mahmoud Houshmand,et al. Configuration design in scalable reconfigurable manufacturing systems (RMS); a case of single-product flow line (SPFL) , 2018, Int. J. Prod. Res..
[20] Hoda A. ElMaraghy,et al. Availability consideration in the optimal selection of multiple-aspect RMS configurations , 2008 .
[21] Joaquín Bautista,et al. Benefits of robust multiobjective optimization for flexible automotive assembly line balancing , 2019 .
[22] Alexandre Dolgui,et al. A decomposition based solution algorithm for U-type assembly line balancing with interval data , 2015, Comput. Oper. Res..
[23] F. Jovane,et al. Reconfigurable Manufacturing Systems , 1999 .
[24] George Chryssolouris,et al. Multi-criteria Assembly Line Design under Demand Uncertainty☆ , 2014 .
[25] Tullio Tolio,et al. Design of flexible transfer lines: A case-based reconfiguration cost assessment , 2013 .
[26] Fred M. Tonge,et al. Summary of a Heuristic Line Balancing Procedure , 1960 .
[27] Madhu Jain,et al. Optimal configuration selection for reconfigurable manufacturing system using NSGA II and TOPSIS , 2012 .
[28] Alexandre Dolgui,et al. Robust balancing of straight assembly lines with interval task times , 2013, J. Oper. Res. Soc..
[29] Hoda A. ElMaraghy,et al. Flexible and reconfigurable manufacturing systems paradigms , 2005 .
[30] Jinlin Li,et al. Balancing manual mixed-model assembly lines using overtime work in a demand variation environment , 2014 .
[31] Alexandre Dolgui,et al. Balancing reconfigurable machining lines via a set partitioning model , 2014 .
[32] Joaquín Bautista,et al. A robustness information and visualization model for time and space assembly line balancing under uncertain demand , 2013 .
[33] Carlos Andrés,et al. Balancing and scheduling tasks in assembly lines with sequence-dependent setup times , 2008, Eur. J. Oper. Res..
[34] Jun Li,et al. Bi-objective optimization of integrating configuration generation and scheduling for reconfigurable flow lines using NSGA-II , 2016 .
[35] Li Aiping,et al. A Heuristic Approach to Solve an Industrial Scalability Problem , 2017 .
[36] Hoda A. ElMaraghy,et al. Optimal configuration selection for Reconfigurable Manufacturing Systems , 2007 .