Reliability Characteristics Based Maintenance Scheduling: A Case Study of a Crushing Plant
暂无分享,去创建一个
[1] Uday Kumar,et al. Design and development of product support and maintenance concepts for industrial systems , 2003 .
[2] Uday Kumar,et al. Reliability investigation for a fleet of load haul dump machines in a Swedish mine , 1989 .
[3] Uday Kumar,et al. Reliability analysis of power transmission cables of electric mine loaders using the proportional hazards model , 1992 .
[4] B. S. Hauge. Optimizing intervals for inspection and failure-finding tasks , 2002, Annual Reliability and Maintainability Symposium. 2002 Proceedings (Cat. No.02CH37318).
[5] Laeeque K. Daneshmend,et al. Reliability Modelling of Surface Mining Equipment: Data Gathering and Analysis Methodologies , 2003 .
[6] Javad Barabady. Improvement of system availability using reliability and maintainability analysis , 2005 .
[7] Yuo-Tern Tsai,et al. A study of availability-centered preventive maintenance for multi-component systems , 2004, Reliab. Eng. Syst. Saf..
[8] J. Barabady. Reliability and maintainability analysis of crushing plants in Jajarm bauxite mine of Iran , 2005, Annual Reliability and Maintainability Symposium, 2005. Proceedings..
[9] Luiz Steinberg,et al. Maintenance of mobile mine equipment in the information age , 2001 .
[10] Uday Kumar,et al. Reliability and operating environment‐based spare parts estimation approach: A case study in Kiruna Mine, Sweden , 2005 .