Project Scheduling with Time Windows

[1]  M. B. Clowes,et al.  On Seeing Things , 1971, Artif. Intell..

[2]  Rema Padman,et al.  An integrated survey of deterministic project scheduling , 2001 .

[3]  Klaus H. Ecker,et al.  Scheduling Computer and Manufacturing Processes , 2001 .

[4]  Erwin Pesch,et al.  Solving the open shop scheduling problem , 2001 .

[5]  Armin Scholl,et al.  PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem , 2000, Math. Methods Oper. Res..

[6]  Robert Klein,et al.  Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects , 2000, Eur. J. Oper. Res..

[7]  G. Fandel,et al.  Constraint Propagation in Flexible Manufacturing , 2000 .

[8]  Erwin Pesch,et al.  Constraint propagation techniques for the disjunctive scheduling problem , 2000, Artif. Intell..

[9]  Arno Sprecher,et al.  Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements , 2000 .

[10]  Bert De Reyck,et al.  The multi-mode resource-constrained project scheduling problem with generalized precedence relations , 1999, Eur. J. Oper. Res..

[11]  Robert Klein,et al.  Scheduling of Resource-Constrained Projects , 1999 .

[12]  Yangjun Chen,et al.  Arc Consistency Revisited , 1999, Inf. Process. Lett..

[13]  Rainer Kolisch,et al.  Project Scheduling Under Partially Renewable Resource Constraints , 1999 .

[14]  Armin Scholl,et al.  Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling , 1999, Eur. J. Oper. Res..

[15]  Sönke Hartmann,et al.  Project scheduling with multiple modes: A comparison of exact algorithms , 1998, Networks.

[16]  Johannes Endler,et al.  Flughäfen und Luftverkehr — Eine Branche im Umbruch , 1998 .

[17]  Arno Sprecher,et al.  Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm , 1998, Eur. J. Oper. Res..

[18]  Peter Brucker,et al.  A branch and bound algorithm for the resource-constrained project scheduling problem , 1998, Eur. J. Oper. Res..

[19]  V. Maniezzo,et al.  An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation , 1998 .

[20]  Martin C. Cooper,et al.  Constraints, Consistency and Closure , 1998, Artif. Intell..

[21]  Erik Demeulemeester,et al.  Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..

[22]  Claude Le Pape,et al.  Constraint-Based Job Shop Scheduling with IILOG SCHEDULER , 1998, J. Heuristics.

[23]  RAINER KOLISCH,et al.  Local search for nonpreemptive multi-mode resource-constrained project scheduling , 1997 .

[24]  Arno Sprecher,et al.  An exact algorithm for project scheduling with multiple modes , 1997 .

[25]  Yu Cheng,et al.  A knowledge-based airport gate assignment system integrated with mathematical programming , 1997 .

[26]  Erik Demeulemeester,et al.  A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem , 1997, Oper. Res..

[27]  Rainer Kolisch,et al.  PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .

[28]  Jacek Blazewicz,et al.  The job shop scheduling problem: Conventional and new solution techniques , 1996 .

[29]  Ulrich A. W. Tetzlaff,et al.  Constraint Propagation Based Scheduling of Job Shops , 1996, INFORMS J. Comput..

[30]  Fayez F. Boctor,et al.  A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes , 1996 .

[31]  Yishai A. Feldman,et al.  Portability by automatic translation a large-scale case study , 1995, Proceedings 1995 10th Knowledge-Based Software Engineering Conference.

[32]  Gündüz Ulusoy,et al.  A survey on the resource-constrained project scheduling problem , 1995 .

[33]  Philippe Baptiste,et al.  A Theoretical and Experimental Comparison of Constraint Propagation Techniques for Disjunctive Scheduling , 1995, IJCAI.

[34]  Salah E. Elmaghraby,et al.  Activity nets: A guided tour through some recent developments , 1995 .

[35]  Claude Le Pape,et al.  Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems , 1994 .

[36]  Peter Brucker,et al.  The job-shop problem and immediate selection , 1994, Ann. Oper. Res..

[37]  J. Carlier,et al.  Adjustment of heads and tails for the job-shop problem , 1994 .

[38]  Ji Zhan,et al.  Heuristics for scheduling resource-constrained projects in MPM networks , 1994 .

[39]  Erwin Pesch,et al.  Fast Clustering Algorithms , 1994, INFORMS J. Comput..

[40]  H. Günther,et al.  Produktion Und Logistik , 1994 .

[41]  F. F. Boctor Heuristics for scheduling projects with resource restrictions and several resource-duration modes , 1993 .

[42]  S. Selcuk Erenguc,et al.  Project Scheduling Problems: A Survey , 1993 .

[43]  Andreas Drexl,et al.  Nonpreemptive multi-mode resource-constrained project scheduling , 1993 .

[44]  Olivier Lhomme,et al.  Consistency Techniques for Numeric CSPs , 1993, IJCAI.

[45]  Edward P. K. Tsang,et al.  Foundations of constraint satisfaction , 1993, Computation in cognitive science.

[46]  Christian Bessiere,et al.  Arc-Consistency and Arc-Consistency Again , 1993, Artif. Intell..

[47]  Ramón Alvarez-Valdés Olaguíbel,et al.  The project scheduling polyhedron: Dimension, facets and lifting theorems , 1993 .

[48]  Nicolas Beldiceanu,et al.  Extending CHIP in order to solve complex scheduling and placement problems , 1993, JFPL.

[49]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[50]  Pascal Van Hentenryck,et al.  A Generic Arc-Consistency Algorithm and its Specializations , 1992, Artif. Intell..

[51]  Vipin Kumar,et al.  Algorithms for Constraint-Satisfaction Problems: A Survey , 1992, AI Mag..

[52]  Andreas Drexl,et al.  Scheduling of Project Networks by Job Assignment , 1991 .

[53]  Alan K. Mackworth The Logic of Constraint Satisfaction , 1991, Artif. Intell..

[54]  William J. Cook,et al.  A Computational Study of the Job-Shop Scheduling Problem , 1991, INFORMS Journal on Computing.

[55]  Martin Grötschel,et al.  Facets of the clique partitioning polytope , 1990, Math. Program..

[56]  S. C. Wirasinghe,et al.  AIRPORT GATE POSITION ESTIMATION FOR MINIMUM TOTAL COSTS : APPROXIMATE CLOSED FORM SOLUTION , 1990 .

[57]  Peter van Beek,et al.  Reasoning About Qualitative Temporal Information , 1990, Artif. Intell..

[58]  Jacques Cohen,et al.  Constraint logic programming languages , 1990, CACM.

[59]  Alain Colmerauer,et al.  An introduction to Prolog III , 1989, CACM.

[60]  Chia-Hoang Lee,et al.  Comments on Mohr and Henderson's Path Consistency Algorithm , 1988, Artif. Intell..

[61]  Wolfgang Bibel,et al.  Constraint Satisfaction from a Deductive Viewpoint , 1988, Artif. Intell..

[62]  Rolf H. Möhring,et al.  Scheduling project networks with resource constraints and time windows , 1988 .

[63]  Rina Dechter,et al.  Network-Based Heuristics for Constraint-Satisfaction Problems , 1987, Artif. Intell..

[64]  Ernest Davis,et al.  Constraint Propagation with Interval Labels , 1987, Artif. Intell..

[65]  Salah G. Hamzawi,et al.  MANAGEMENT AND PLANNING OF AIRPORT GATE CAPACITY: A MICROCOMPUTER-BASED GATE ASSIGNMENT SIMULATION MODEL , 1986 .

[66]  Thomas C. Henderson,et al.  Arc and Path Consistency Revisited , 1986, Artif. Intell..

[67]  F. Radermacher Scheduling of project networks , 1985 .

[68]  Dennis F. X. Mathaisel,et al.  Optimizing Gate Assignments at Airport Terminals , 1985, Transp. Sci..

[69]  Eugene C. Freuder,et al.  The Complexity of Some Polynomial Network Consistency Algorithms for Constraint Satisfaction Problems , 1985, Artif. Intell..

[70]  James F. Allen Maintaining knowledge about temporal intervals , 1983, CACM.

[71]  Arnoldo C. Hax,et al.  Production and inventory management , 1983 .

[72]  F. Brian Talbot,et al.  Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .

[73]  J. Carlier The one-machine sequencing problem , 1982 .

[74]  Raimund Seidel,et al.  A New Method for Solving Constraint Satisfaction Problems , 1981, IJCAI.

[75]  Eugene C. Freuder Synthesizing constraint expressions , 1978, CACM.

[76]  A. Thesen,et al.  Measures of the restrictiveness of project networks , 1977, Networks.

[77]  C. Bron,et al.  Algorithm 457: finding all cliques of an undirected graph , 1973 .

[78]  Victor Zaloom,et al.  On the Resource Constrained Project Scheduling Problem , 1971 .

[79]  Paul Baron,et al.  A simulation analysis of airport terminal operations , 1969 .

[80]  E. Lawler The Quadratic Assignment Problem , 1963 .

[81]  D. R. Fulkerson Expected Critical Path Lengths in PERT Networks , 1962 .

[82]  James E. Kelley,et al.  Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .

[83]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .

[84]  K. Neumann,et al.  Methods for Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions and Schedule-Dependent Time Windows , 1999 .

[85]  Rainer Kolisch,et al.  Benchmark instances for project scheduling problems , 1999 .

[86]  Rolf H. Möhring,et al.  Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..

[87]  Philippe Baptiste,et al.  Satisfiability tests and time‐bound adjustmentsfor cumulative scheduling problems , 1999, Ann. Oper. Res..

[88]  Armin Scholl,et al.  Scattered branch and bound: an adaptive search strategy applied to resource-constrained project scheduling , 1998 .

[89]  C. Le Pape,et al.  Three mechanisms for managing resource constraints in a library for constraint-based scheduling , 1995 .

[90]  Rainer Kolisch,et al.  Project Scheduling under Resource Constraints , 1995 .

[91]  Wpm Wim Nuijten,et al.  Time and resource constrained scheduling : a constraint satisfaction approach , 1994 .

[92]  S. C. Wirasinghe,et al.  Walking distance minimization for airport terminal configurations , 1992 .

[93]  Krishnaswami Srihari,et al.  An expert system methodology for aircraft-gate assignment , 1991 .

[94]  Geoffrey D. Gosling,et al.  Design of an expert system for aircraft gate assignment , 1990 .

[95]  Wolfgang Domschke,et al.  Einführung in Operations Research , 1990 .

[96]  Pascal Van Hentenryck Constraint satisfaction in logic programming , 1989, Logic programming.

[97]  Pedro Meseguer,et al.  Constraint Satisfaction Problems: An Overview , 1989, AI Commun..

[98]  Michael J. Maher,et al.  Logic Programming Language Scheme , 1986, Logic Programming: Functions, Relations, and Equations.

[99]  Dušan Teodorović,et al.  Aircraft Stand Assignment to Minimize Walking , 1984 .

[100]  Jan Karel Lenstra,et al.  Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..

[101]  Eugene C. Freuder A Sufficient Condition for Backtrack-Free Search , 1982, JACM.

[102]  J. We¸Glarz,et al.  ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS , 1980 .

[103]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[104]  Alan K. Mackworth Consistency in Networks of Relations , 1977, Artif. Intell..

[105]  Salah E. Elmaghraby,et al.  Activity networks: Project planning and control by network models , 1977 .

[106]  David L. Waltz,et al.  Understanding Line drawings of Scenes with Shadows , 1975 .

[107]  Ugo Montanari,et al.  Networks of constraints: Fundamental properties and applications to picture processing , 1974, Inf. Sci..

[108]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[109]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[110]  Thomas Joel Russell Johnson,et al.  An algorithm for the resource constrained project scheduling problem , 1967 .