Managing testing activities in telecommunications: A case study

This paper examines ways of managing testing more efficiently and effectively. The importance and the workload of testing have been growing constantly in the telecommunication industry, as a result of shorter product lifecycles and decreased time-to-market. At the same time, the complexity of products has increased with a decrease in physical dimensions. Managers face enormous challenges in developing knowledge and effective testing processes. This case study proposes the application of two models, a testing optimization model and an extended V2M2 (Verification Validation Maturity Model) model, for managing the value of testing. In the empirical part of the study, the present state of testing management is examined.

[1]  E.P.W.M. van Veenendaal,et al.  Structured testing of information systems : an introduction to TMap , 1998 .

[2]  Gordon W. Roberts,et al.  An Introduction to Mixed-Signal IC Test and Measurement , 2000 .

[3]  Armand V. Feigenbaum,et al.  Total quality control , 1961 .

[4]  Brendan Davis The Economics of Automatic Testing , 1982 .

[5]  John S. Oakland,et al.  Tqm: Text with Cases , 2003 .

[6]  Taratip Suwannasart,et al.  Developing a Testing Maturity Model, Part II , 1996 .

[7]  Tom Gilb,et al.  Competitive Engineering: A Handbook For Systems Engineering, Requirements Engineering, And Software Engineering Using Planguage , 2005 .

[8]  David Abercrombie,et al.  Value-added defect testing techniques , 2005, IEEE Design & Test of Computers.

[9]  Richard Turner,et al.  CMMI Distilled: A Practical Introduction to Integrated Process Improvement , 2001 .

[10]  Hisham M. Haddad,et al.  A survey of industrial experiences with CMM and the teaching of CMM practices , 2002 .

[11]  Stefano Biazzo,et al.  Organisational self‐assessment options , 2003 .

[12]  E. Kessler Tightening the belt: methods for reducing development costs associated with new product innovation , 2000 .

[13]  Mahmoud M. Yasin,et al.  In search of an optimal cost of quality: an integrated framework of operational efficiency and strategic effectiveness , 1999 .

[14]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[15]  Edward Kit,et al.  Software testing in the real world - improving the process , 1995 .

[16]  Rune M. Moen New quality cost model used as a top management tool , 1998 .

[17]  Vince Thomson,et al.  Managing cost of quality: insight into industry practice , 2006 .

[18]  R. Yin Case Study Research: Design and Methods , 1984 .

[19]  Melvin A. Breuer,et al.  Digital systems testing and testable design , 1990 .

[20]  Mary Jean Harrold,et al.  Testing: a roadmap , 2000, ICSE '00.

[21]  B. Freimut,et al.  The importance of life cycle modeling to defect detection and prevention , 2002, 10th International Workshop on Software Technology and Engineering Practice.

[22]  Abbie Griffin,et al.  The PDMA toolbook for new product development , 2002 .

[23]  John Preston,et al.  Winning at New Products , 1988 .

[24]  Satish Nambisan,et al.  Software firm evolution and innovation–orientation , 2002 .

[25]  Martin R. Woodward,et al.  Strategic benefits of software test management: a case study , 2005 .

[26]  Mary Beth Chrissis,et al.  CMMI: Guidelines for Process Integration and Product Improvement , 2003 .

[27]  Antony Black Critical Testing Process: Plan, Prepare, Perform, Perfect , 2003 .

[28]  Sara A. McComb,et al.  Exploring why more communication is not better: insights from a computational model of cross-functional teams , 2004 .

[29]  B. Wüthrich AN INTERNATIONAL SYMPOSIUM , 1997 .

[30]  David Chenho Kung,et al.  Testing Object-Oriented Software , 1998 .

[31]  David E. Booth,et al.  The impact and management of cognitive gap in high performance product development organizations , 2006 .

[32]  Per Runeson,et al.  Verification and validation in industry - a qualitative survey on the state of practice , 2002, Proceedings International Symposium on Empirical Software Engineering.

[33]  Abbie Griffin,et al.  Modeling and measuring product development cycle time across industries , 1997 .

[34]  L. J. Porter,et al.  Quality costing for total quality management , 1992 .

[35]  W. Deming Out of the crisis : quality, productivity and competitive position , 1986 .

[36]  Felix Redmill Theory and practice of risk‐based testing , 2005, Softw. Test. Verification Reliab..