Indicators and Metrics for Risk Assessment in Software Projects : A Mapping Study

The usage of metrics and indicators in software development companies acts in both strategic and tactical levels, it is effective for optimization of processes and also helps in managerial decisions. On the other hand, because of abstractness and subjectivity of the risk, the risk management is many times overlooked by the software development organizations. Therefore, it is necessary the definition of metrics and indicators for risk assessment in order to make the risk management a more reliable activity through real information and data available from projects. In this light, this paper presents the application of a systematic mapping study that aims to raise related work to the usage of metrics and indicators for risk assessment in multiple projects environments.

[1]  Cristine Gusmão,et al.  CBR RISK - RISK IDENTIFICATION METHOD USING CASE BASEDREASONING , 2008 .

[2]  D. Gupta,et al.  Software Risk Assessment and Estimation Model , 2008, 2008 International Conference on Computer Science and Information Technology.

[3]  Chun-Hui Wu,et al.  Exploring impacts of software development process maturity on project risk , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[4]  Lars Mathiassen,et al.  A Process for Managing Risks in Distributed Teams , 2010, IEEE Software.

[5]  Michael J. Gallivan,et al.  A framework for ex ante project risk assessment based on absorptive capacity , 2006, Eur. J. Oper. Res..

[6]  Jyrki Kontio,et al.  Software engineering risk management : a method, improvement framework, and empirical evaluation , 2001 .

[7]  Reza Ramazani Khorshid-Doust,et al.  A method of project selection based on capital asset pricing theories in a framework of mean–semideviation behavior , 2008 .

[8]  A. Krishnan,et al.  Overview analysis of reusability metrics in software development for risk reduction , 2010, 2010 International Conference on Innovative Computing Technologies (ICICT).

[9]  Cristine Martins Gomes de Gusmão Um Modelo de Processo de Gestão de Riscos para Ambientes de Múltiplos Projetos de Desenvolvimento de Software , 2009 .

[10]  Blaize Horner Reich,et al.  The impact of size and volatility on IT project performance , 2007, CACM.

[11]  Tom DeMarco,et al.  The Deadline: A Novel About Project Management , 1997 .

[12]  Nuridawati Mustafa,et al.  Software risk assessment visualization tool design using probabilistic inference models , 2010, 2010 International Symposium on Information Technology.

[13]  Adolfo López-Paredes,et al.  An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index , 2011 .

[14]  Israel Spiegler,et al.  Developing risk breakdown structure for information technology organizations , 2011 .

[15]  Feng Tao,et al.  A model based on information entropy to measure developer turnover risk on software project , 2009, 2009 2nd IEEE International Conference on Computer Science and Information Technology.

[16]  Michel Benaroch,et al.  Financial Pricing of Software Development Risk Factors , 2010, IEEE Software.

[17]  Marcos Esterman,et al.  The Development of Project Risk Metrics for Robust Concurrent Product Development (CPD) across the Supply Chain , 2005, Concurr. Eng. Res. Appl..

[18]  Suresh L. Konda,et al.  Taxonomy-Based Risk Identification , 1993 .

[19]  Ahmad Hosseingholizadeh A source-based risk analysis approach for software test optimization , 2010, 2010 2nd International Conference on Computer Engineering and Technology.

[20]  A. En-Nouaary,et al.  Catalog of Metrics for Assessing Security Risks of Software throughout the Software Development Life Cycle , 2008, 2008 International Conference on Information Security and Assurance (isa 2008).

[21]  Franco Caron,et al.  Engineering and contracting projects: A value at risk based approach to portfolio balancing , 2007 .

[22]  Gregorio Robles,et al.  Using Software Archaeology to Measure Knowledge Loss in Software Projects Due to Developer Turnover , 2009 .

[23]  Paula Gomes Mian,et al.  Systematic Review in Software Engineering , 2005 .

[24]  G. P. Kulk,et al.  Quantifying IT estimation risks , 2009, Sci. Comput. Program..

[25]  Lisa Turnbaugh Risk Management on Large Capital Projects , 2005 .

[26]  Chris Verhoef,et al.  Quantifying the value of IT-investments , 2005, Sci. Comput. Program..

[27]  Ellen Souza,et al.  Measurement and control for risk-based test cases and activities , 2009, 2009 10th Latin American Test Workshop.

[28]  Juite Wang,et al.  A performance-oriented risk management framework for innovative R&D projects , 2010 .

[29]  Stefan Fiedler,et al.  Managing resistance in an organizational transformation: A case study from a mobile operator company , 2010 .

[30]  Liao Hongzhi,et al.  An Approach to Measuring Software Development Risk Based on Information Entropy , 2009, 2009 International Conference on Computational Intelligence and Natural Computing.

[31]  A. Boonstra,et al.  Does risk management contribute to IT project success? A meta-analysis of empirical evidence , 2010 .

[32]  H.K.N. Leung,et al.  Notice of RetractionMeasuring Risks within a Program Consisting of Multiple Interdependent Projects , 2009, 2009 International Conference on Computational Intelligence and Software Engineering.