Preparing for end of service life of wind turbines

Abstract The wind power industry is growing rapidly. Wind turbines (WTs) are perceived as a low environmental impact energy generation technology. While the service life of a WT is relatively long (20–40 years), at some point a significant number of WTs will reach the end of their service lives. To recover maximum value from these WTs, planning for the end-of-service life of wind turbines (EOSLWTs) is paramount. Historically, environmental life cycle assessments of WTs have often only considered the materials extraction and processing, manufacturing, and use phases, leaving the management of EOSLWTs outside the scope of their attention. Four key EOSLWTs issues that are essential for the continuing development of wind energy technologies are presented: i) The challenges of managing of EOSLWTs given the fast growth rate of the industry and the large number of existing installed WTs; ii) The EOSLWT alternatives such as remanufacturing and recycling to recover functional and material value respectively; iii) The critical activities in the WT reverse supply chain such as recovery methods, logistics of transportation, quality of returns, and quality of reprocessed WTs; and iv) The economic and business issues associated with EOSLWTs. It is expected that the discussion provided will stimulate a dialog among decision makers and raise awareness of economic opportunities and unanticipated challenges in the wind power industry.

[1]  Frances Wall,et al.  Rare Earth Elements , 2013, Encyclopedia of Geology.

[2]  Dominique Millet,et al.  Designing a sustainable reverse logistics channel: the 18 generic structures framework , 2011 .

[3]  Edgar G. Hertwich,et al.  Life cycle assessment of a floating offshore wind turbine , 2009 .

[4]  M. Seitz A critical assessment of motives for product recovery: the case of engine remanufacturing , 2007 .

[5]  Fukuda Tadashi,et al.  Recycling of rare earth magnet scraps: Carbon and oxygen removal from Nd magnet scraps , 2006 .

[6]  Stephen C. Graves,et al.  Remanufacturing and energy savings. , 2011, Environmental science & technology.

[7]  Aldo Roberto Ometto,et al.  Ecodesign methods focused on remanufacturing , 2010 .

[8]  Albert Corominas,et al.  Optimal manufacturing-remanufacturing policies in a lean production environment , 2008, Comput. Ind. Eng..

[9]  Francis Meunier,et al.  Life cycle analysis of 4.5 MW and 250 W wind turbines , 2009 .

[10]  Valerio Lo Brano,et al.  Energy performances and life cycle assessment of an Italian wind farm , 2008 .

[11]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[12]  Chris Ryan,et al.  Eco-efficiency gains from remanufacturing: A case study of photocopier remanufacturing at Fuji Xerox Australia , 2001 .

[13]  John W. Sutherland,et al.  A comparison of manufacturing and remanufacturing energy intensities with application to diesel engine production , 2008 .

[14]  Stefano Pellegrini,et al.  Life-cycle assessment of a 2-MW rated power wind turbine: CML method , 2008 .

[15]  Tamer Boyacı,et al.  The effect of categorizing returned products in remanufacturing , 2004 .

[16]  Christopher A. Walford,et al.  Wind Turbine Reliability: Understanding and Minimizing Wind Turbine Operation and Maintenance Costs , 2006 .

[17]  Mohit Goyal,et al.  Repowering—Next big thing in India , 2010 .

[18]  Hülya Behret,et al.  Quality of returns: Is it a factor in remanufacturing? , 2005, SPIE Optics East.

[19]  Gareth Harrison,et al.  Energy and carbon audit of a rooftop wind turbine , 2006 .

[20]  Geoffrey P. Hammond,et al.  Embodied energy and carbon in construction materials , 2008 .

[21]  Samir K. Srivastava,et al.  Green Supply-Chain Management: A State-of-the-Art Literature Review , 2007 .

[22]  Ratna Babu Chinnam,et al.  Aftermarket remanufacturing strategic planning decision-making framework: theory & practice , 2010 .

[23]  E. Martínez,et al.  LCA sensitivity analysis of a multi-megawatt wind turbine , 2010 .

[24]  María Isabel Blanco The economics of wind energy , 2009 .

[25]  T. Gutowski,et al.  Appliance remanufacturing and life cycle energy and economic savings , 2010, Proceedings of the 2010 IEEE International Symposium on Sustainable Systems and Technology.

[26]  Barbara T. Fichman Annual Energy Review 2009 , 2010 .

[27]  John W. Sutherland,et al.  Remanufacturing: An Alternative for End of Use of Wind Turbines , 2012 .

[28]  Subodh K. Das Aluminum recycling in a carbon constrained world: Observations and opportunities , 2011 .

[29]  Geoffrey P. Hammond,et al.  Energy analysis and environmental life cycle assessment of a micro-wind turbine , 2008 .

[30]  Roberto Dones,et al.  Life Cycle Assessment for Emerging Technologies: Case Studies for Photovoltaic and Wind Power (11 pp) , 2005 .

[31]  J. Munksgaard,et al.  Energy and CO2 life-cycle analyses of wind turbines—review and applications , 2002 .

[32]  Geoffrey P. Hammond,et al.  Development of robust design-for-remanufacturing guidelines to further the aims of sustainable development , 2007 .

[33]  T. Speh,et al.  Remarketing: Commercialization of Remanufacturing Technology , 1991 .

[34]  Govindan Kannan,et al.  Issues in reverse supply chain, part III: classification and simple analysis , 2009 .

[35]  Margarete A. Seitz,et al.  Challenging the implementation of corporate sustainability: The case of automotive engine remanufacturing , 2006, Bus. Process. Manag. J..

[36]  Kari Larsen,et al.  Recycling wind turbine blades , 2009 .

[37]  Per Dannemand Andersen,et al.  Managing long-term environmental aspects of wind turbines: a prospective case study , 2007 .