Selection of Project Delivery Method in Transit: Drivers and Objectives
暂无分享,去创建一个
Keith R. Molenaar | Ali Touran | Douglas D. Gransberg | Kamran Ghavamifar | A. Touran | K. Molenaar | D. Gransberg | K. Ghavamifar
[1] Michael J. Ginzberg,et al. Redesign of Managerial Tasks: A Requisite for Successful Decision Support Systems , 1978, MIS Q..
[2] A Ardani,et al. EVALUATION OF DESIGN BUILD PRACTICE IN COLORADO, IR(CX)70-4(143) , 1997 .
[3] L. Phillips. A theory of requisite decision models , 1984 .
[4] Keith R. Molenaar,et al. Selecting Design-Build: Public and Private Sector Owner Attitudes , 1996 .
[5] Keith R. Molenaar,et al. Evaluation of Project Delivery Methods , 2008 .
[6] Mark Konchar,et al. Comparison of U.S. Project Delivery Systems , 1998 .
[7] Christopher M. Gordon,et al. Choosing Appropriate Construction Contracting Method , 1994 .
[8] G E Gibson,et al. PROJECT DELIVERY METHODS AND CONTRACTING APPROACHES AVAILABLE FOR IMPLEMENTATION BY THE TEXAS DEPARTMENT OF TRANSPORTATION , 2001 .
[9] John Messner,et al. Comparing procurement methods for design-build projects , 2006 .
[10] Stuart D. Anderson,et al. Relative Effectiveness of Project Delivery and Contract Strategies , 2006 .
[11] C. William Ibbs,et al. Project delivery systems and project change: Quantitative analysis , 2003 .
[12] Robert Ries,et al. Construction Delivery Systems: A Comparative Analysis of Their Performance within School Districts , 2006 .
[13] R. Yin. Case Study Research: Design and Methods , 1984 .
[14] Ibrahim M. Mahdi,et al. Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .