SURVEY OF ACCOMPLISHMENTS IN BIM IMPLEMENTATION IN CROATIA, THE CZECH REPUBLIC, GERMANY, AND SLOVENIA

Building information modelling (BIM) may currently be considered the fastest developing concept in the field of construction management, aiming to become a global standard. Although the roots of the concept date back to the mid-1970s, some original expectations are still missing from its implementation. There has been a time gap between its theoretical and practical implementations. While the simultaneous development of information technologies is one reason for the implementation delay, other reasons remain unclear. This paper analyzes the gaps between theoretical and practical BIM application, as well as the legislation regarding BIM implementation in four countries (in alphabetical order: Croatia, the Czech Republic, Germany, and Slovenia). The paper additionally presents a survey of current practical BIM applications as well as general and theoretical feedback from construction projects that implemented BIM.

[1]  A. Behringer A BIM-based Approach for Communicating and Implementing a Construction Site Safety Plan , 2013 .

[2]  Zlata Dolaček-Alduk,et al.  BIM in planning deconstruction projects , 2014 .

[3]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[4]  Dragana Mutavdžić Pavlović,et al.  Developing a methodology for preparation and execution phase of construction project , 2015 .

[5]  Stjepan Lakusic Izobrazba o primjeni BIM-a kao podrške integriranom projektiranju , 2015 .

[6]  Andrej Štrukelj,et al.  Application of 6D Building Information Model (6D BIM) for Business-storage Building in Slovenia , 2017 .

[7]  Markus Hochmuth,et al.  BIM‐Pilotprojekt Talbrücke Auenbach , 2016 .

[8]  Charles M. Eastman,et al.  The Use of Computers Instead of Drawings in Building Design. , 1975 .

[9]  Zlata Dolaček-Alduk,et al.  CONSTRUCTABILITY-BUILDABILITY-IZGRADIVOST , 2013 .

[10]  Petr Matějka,et al.  The Integration of BIM in Later Project Life Cycle Phases in Unprepared Environment from FM Perspective , 2016 .

[11]  Tatjana Baroš Primjena BIM tehnologije i njezina pouzdanost u statičkoj analizi konstrukcija , 2016 .

[12]  Pavel Vlček,et al.  Application of BIM Process by the Evaluation of Building Energy Sustainability , 2014 .

[13]  John Tookey,et al.  Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges , 2017 .

[14]  Immo Feine,et al.  Weather Forecast as an Additional Dimension to BIM , 2015 .

[15]  Petr Matějka,et al.  The Impact of BIM on Risk Management as an Argument for its Implementation in a Construction Company , 2014 .

[16]  Miroslaw J. Skibniewski Construction Project Monitoring with Site Photographs and 4D Project Models , 2014 .

[17]  Hafez Salleh,et al.  Primjena Building Information Modelinga: analiza na osnovi interesnih skupina , 2014 .

[18]  Mauro Mancini,et al.  Building Information Modelling (BIM) and Project Management: a Stakeholders Perspective , 2014 .

[19]  Vladimir Bazjanac Virtual building environments (VBE) - Applying information modeling to buildings , 2004 .

[20]  Krzysztof Zima,et al.  Prospects for the use of BIM in Poland and the Czech Republic – preliminary research results , 2015 .

[21]  Zlata Dolaček-Alduk,et al.  Improvement of civil engineering education in the field of building informatiom modeling , 2015 .

[22]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[23]  von,et al.  Implementing BIM in the German Architecture, Engineering and Construction Market---A Survey about the Potentials and Barriers , 2013 .

[24]  Karel Kubečka,et al.  BIM - The Process of Modern Civil Engineering , 2014 .

[25]  Ki Pyung Kim,et al.  BIM Feasibility Study For Housing Refurbishment Projects In The UK , 2013 .

[26]  Zlata Dolaček-Alduk,et al.  Reengineering the construction companies in time of the recession , 2013 .