Cost Overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness

Managing large-scale transportation infrastructure projects is difficult due to frequent misinformation about the costs which results in large cost overruns that often threaten the overall project viability. This paper investigates the explanations for cost overruns that are given in the literature. Overall, four categories of explanations can be distinguished: technical, economic, psychological, and political. Political explanations have been seen to be the most dominant explanations for cost overruns. Agency theory is considered the most interesting for political explanations and an eclectic theory is also considered possible. Non-political explanations are diverse in character, therefore a range of different theories (including rational choice theory and prospect theory), depending on the kind of explanation is considered more appropriate than one all-embracing theory.

[1]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[2]  B. Wee Large Infrastructure Projects: A Review of the Quality of Demand Forecasts and Cost Estimations , 2007 .

[3]  John Preston,et al.  Twenty-one sources of error and bias in transport project appraisal , 1998 .

[4]  Bent Flyvbjerg,et al.  Lock-in and its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects: Investigating the Way in Which Lock-in Can Emerge and Affect Cost Overruns , 2010, 1307.2177.

[5]  R. Buehler,et al.  The Role of Motivated Reasoning in Optimistic Time Predictions , 1997 .

[6]  James Odeck,et al.  Cost overruns in road construction--what are their sizes and determinants? , 2004 .

[7]  Bent Flyvbjerg,et al.  Lock-in and its influence on project performance of large-scale transportation infrastructure projects , 2009 .

[8]  Lanny Arvan,et al.  Cost overruns in long term projects , 1990 .

[9]  Roger J Allport,et al.  THE PERFORMANCE AND IMPACT OF RAIL MASS TRANSIT IN DEVELOPING COUNTRIES , 1990 .

[10]  Antonio Estache,et al.  Dealing with demand forecasting games in transport privatization , 2002 .

[11]  D. Kahneman,et al.  Delusions of success. How optimism undermines executives' decisions. , 2003, Harvard business review.

[12]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[13]  Sebastian Morris,et al.  Cost and Time Overruns in Public Sector Projects , 2005 .

[14]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[15]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[16]  Peter Nijkamp,et al.  How Reliable are Estimates of Infrastructure Costs? A Comparative Analysis. , 1999 .

[17]  S. Harrison Rationality and Power: Democracy in Practice , 2001 .

[18]  Jin-Kyung Lee,et al.  Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports , 2008 .

[19]  Werner Rothengatter,et al.  Big decisions, big risks: improving accountability in mega projects , 1998 .

[20]  Martin Wachs Ethical Dilemmas in Forecasting for Public Policy , 1982 .

[21]  A. Tversky,et al.  Prospect theory: an analysis of decision under risk — Source link , 2007 .

[22]  D J McNichol BOSTON'S CENTRAL ARTERY/TUNNEL PROJECT , 1998 .

[23]  Kenneth J. Arrow,et al.  Economic Theory and the Hypothesis of Rationality , 1990 .

[24]  B. Flyvbjerg Measuring Inaccuracy in Travel Demand Forecasting: Methodological Considerations Regarding Ramp Up and Sampling , 2005, 1303.7401.

[25]  D. Pickrell A Desire Named Streetcar Fantasy and Fact in Rail Transit Planning , 1992 .

[26]  Peter W. G. Morris,et al.  The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .

[27]  Martin Wachs,et al.  Forecasts in urban transportation planning: Uses, methods, and dilemmas , 1987 .

[28]  Procedures for Dealing with Optimism Bias in Transport Planning , 2004 .

[29]  James S. Coleman,et al.  Rational Choice Theory: Advocacy and Critique , 1992 .

[30]  Eric W. Noreen,et al.  THE ECONOMICS OF ETHICS: A NEW PERSPECTIVE ON AGENCY THEORY. , 1988 .

[31]  J. Lyneis,et al.  The dynamics of project performance: benchmarking the drivers of cost and schedule overrun , 1999 .

[32]  Martijn Leijten,et al.  Megaprojects and Contested Information , 2007 .

[33]  Andreas Faludi,et al.  A reader in planning theory , 1973 .

[34]  Bent Flyvbjerg,et al.  Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures , 2005, 1303.7400.

[35]  P. Hall,et al.  Great Planning Disasters , 2019 .

[36]  S. Asmervik,et al.  Megaprojects and Risk. An Anatomy of Ambition , 2004 .

[37]  P. Dunleavy Democracy, Bureaucracy, And Public Choice , 1991 .

[38]  D. Kahneman,et al.  Timid choices and bold forecasts: a cognitive perspective on risk taking , 1993 .

[39]  Alan Altshuler,et al.  Mega-Projects: The Changing Politics of Urban Public Investment , 2003 .

[40]  D. Snidal Public Goods, Property Rights, and Political Organizations , 1979 .

[41]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .