Nonpreemptive multi-mode resource-constrained project scheduling
暂无分享,去创建一个
[1] Jan Karel Lenstra,et al. Resource-constrained project scheduling: an international exercise in DSS development , 1988, Decis. Support Syst..
[2] I. Kurtulus,et al. Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .
[3] E. W. Davis,et al. Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .
[4] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[5] J. M. Tamarit,et al. Project scheduling with resource constraints: A branch and bound approach , 1987 .
[6] R. K. Sachdeva,et al. Distributed simulation of resource constrained project scheduling , 1989, Comput. Oper. Res..
[7] F. Radermacher. Scheduling of project networks , 1985 .
[8] Rolf H. Möhring,et al. Design aspects of an advanced model-oriented DSS for scheduling problems in civil engineering , 1989, Decis. Support Syst..
[9] Roman Słowiński,et al. Two Approaches to Problems of Resource Allocation Among Project Activities — A Comparative Study , 1980 .
[10] E. M. Dar-el,et al. Resource Allocation of a Multi-Resource Project for Variable Resource Availabilities , 1978 .
[11] Jacek Blazewicz,et al. Scheduling under resource constraints - deterministic models , 1986 .
[12] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[13] R. Słowiński. Multiobjective network scheduling with efficient use of renewable and nonrenewable resources , 1981 .
[14] Sooyoung Kim,et al. Resource-Constrained Scheduling of Projects with Variable-Intensity Activities , 1990 .
[15] Elliott N. Weiss. An Optimization Based Heuristic for Scheduling Parallel Project Networks with Constrained Renewable Resources , 1988 .
[16] Jan Węglarz,et al. Project Scheduling with Continuously-Divisible, Doubly Constrained Resources , 1981 .
[17] J. H. Patterson,et al. An Algorithm for a general class of precedence and resource constrained scheduling problems , 1989 .
[18] R. P. Mohanty,et al. Multiple projects-multiple resources-constrained scheduling: some studies , 1989 .
[19] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[20] Subhash C. Narula,et al. Multi-Project Scheduling: Analysis of Project Performance , 1985 .
[21] Roman Słowiński,et al. Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems , 1990 .
[22] James H. Patterson,et al. An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems , 1978 .
[23] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[24] Wolfgang Domschke,et al. Kapazitätsplanung in Netzwerken , 1991 .
[25] Andreas Drexl,et al. Scheduling of Project Networks by Job Assignment , 1991 .
[26] Dale F. Cooper,et al. Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation , 1976 .
[27] F. Brian Talbot,et al. Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .