Bi‐objective Modeling Approach for Repairing Multiple Feature Infrastructure Systems
暂无分享,去创建一个
Luís Alçada-Almeida | João Manuel Coutinho-Rodrigues | Nuno Sousa | J. Coutinho-Rodrigues | Luís Alçada-Almeida | Nuno Sousa
[1] H. Adeli,et al. OBJECT-ORIENTED FINITE ELEMENT ANALYSIS USING EER MODEL , 1993 .
[2] Hongzhou Wang,et al. A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..
[3] Hwasoo Yeo,et al. Large-Scale Maintenance Optimization Problems for Civil Infrastructure Systems , 2013 .
[4] Asim Karim,et al. CONSCOM: An OO Construction Scheduling and Change Management System , 1999 .
[5] Leonardo Dueñas-Osorio,et al. The Interdependent Network Design Problem for Optimal Infrastructure System Restoration , 2016, Comput. Aided Civ. Infrastructure Eng..
[6] Hojjat Adeli,et al. Cost Optimization of Structures: Fuzzy Logic, Genetic Algorithms, and Parallel Computing , 2006 .
[7] Hoang Pham,et al. Availability and mean life time prediction of multistage degraded system with partial repairs , 1997 .
[8] Z. Lounis,et al. A Multiobjective and Stochastic System for Building Maintenance Management , 2000 .
[9] Jared L. Cohon,et al. Multiobjective programming and planning , 2004 .
[10] Susan L. Tighe,et al. A Web-Centric Information Model for Managing Road Infrastructure Data , 2006, Comput. Aided Civ. Infrastructure Eng..
[11] João Manuel Coutinho-Rodrigues,et al. A bi-objective modeling approach applied to an urban semi-desirable facility location problem , 2012, Eur. J. Oper. Res..
[12] John E. Mitchell,et al. Restoration of Services in Interdependent Infrastructure Systems: A Network Flows Approach , 2007, IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews).
[13] Asim Karim,et al. OO Information Model for Construction Project Management , 1999 .
[14] Hojjat Adeli,et al. Bilevel Parallel Genetic Algorithms for Optimization of Large Steel Structures , 2001 .
[15] E. G. Kyriakidis,et al. An improved algorithm for the computation of the optimal repair/replacement policy under general repairs , 2007, Eur. J. Oper. Res..
[16] Hojjat Adeli,et al. Cost Optimization of Concrete Structures , 1999 .
[17] John E. Mitchell,et al. Restoring infrastructure systems: An integrated network design and scheduling (INDS) problem , 2012, Eur. J. Oper. Res..
[18] Asim Karim,et al. OBJECT-ORIENTED INFORMATION MODEL FOR CONSTRUCTION PROJECT MANAGEMENT , 2001 .
[19] Di Sivo Michele,et al. Decision-support tools for municipal infrastructure maintenance management , 2011, WCIT.
[20] Hojjat Adeli,et al. Object‐Oriented Model for Freeway Work Zone Capacity and Queue Delay Estimation , 2004 .
[21] Matthias Ehrgott,et al. Multicriteria Optimization , 2005 .
[22] Hojjat Adeli,et al. An integrated computing environment for solution of complex engineering problems using the object-oriented programming paradigm and a blackboard architecture , 1995 .
[23] Luís Alçada-Almeida,et al. Solving a location-routing problem with a multiobjective approach: the design of urban evacuation plans , 2012 .
[24] Hojjat Adeli,et al. Regularization neural network for construction cost estimation , 1998 .
[25] Hojjat Adeli,et al. Design-independent CAD window system using the object-oriented paradigm and HP X widget environment , 1993 .
[26] Hui Gao,et al. Determining an Optimal Maintenance Period for Infrastructure Systems , 2012, Comput. Aided Civ. Infrastructure Eng..
[27] K E Rosing,et al. Optimal Clustering , 1986 .
[28] Masaaki Kijima,et al. Periodical replacement problem without assuming minimal repair , 1988 .
[29] Samer Madanat,et al. OPTIMAL MAINTENANCE AND REPAIR POLICIES IN INFRASTRUCTURE MANAGEMENT UNDER UNCERTAIN FACILITY DETERIORATION RATES: AN ADAPTIVE CONTROL APPROACH , 2002 .
[30] Hojjat Adeli,et al. Object-oriented blackboard models for integrated design of steel structures , 1996 .
[31] Kelvin C. P. Wang,et al. 20/30 HINDSIGHT -- THE NEW PAVEMENT OPTIMIZATION IN THE ARIZONA STATE HIGHWAY NETWORK. , 1996 .
[32] João Manuel Coutinho-Rodrigues,et al. Housing evaluation with web-SDSS in urban regeneration actions , 2013 .
[33] Tarek Hegazy,et al. MOST‐FIT: Support Techniques for Inspection and Life Cycle Optimization in Building Asset Management , 2012, Comput. Aided Civ. Infrastructure Eng..
[34] Hui Gao,et al. A Markov‐Based Road Maintenance Optimization Model Considering User Costs , 2013, Comput. Aided Civ. Infrastructure Eng..
[35] Yanfeng Ouyang,et al. Optimal Clustering of Railroad Track Maintenance Jobs , 2014, Comput. Aided Civ. Infrastructure Eng..
[36] Kamal Golabi,et al. A Statewide Pavement Management System , 1982 .
[37] Hojjat Adeli,et al. COST OPTIMIZATION OF STEEL STRUCTURES , 2000 .
[38] Samer Madanat,et al. Accounting for Network Effects in Railway Asset Management , 2013 .
[39] Zhe George Zhang,et al. A discrete semi-Markov decision model to determine the optimal repair/replacement policy under general repairs , 2000, Eur. J. Oper. Res..
[40] Hojjat Adeli,et al. DISCRETE COST OPTIMIZATION OF COMPOSITE FLOORS USING A FLOATING-POINT GENETIC ALGORITHM , 2001 .
[41] Kamal C. Sarma. Fuzzy discrete multicriteria cost optimization of steel structures using genetic algorithm , 2000 .