Critical issues in lean manufacturing programs: A case study in Kurdish iron & steel factories

Abstract The main idea of lean manufacturing is actually simple and means relentlessly work on eliminating waste from the manufacturing process. However, after implementing these systems, many organizations find it difficult to achieve the desired results of them. Thus, the lean manufacturing remains an important area of research. For the importance of what was presented, this paper tries to investigate the critical issues affecting the success of implementing lean manufacturing programs in the iron and steel factories in the Kurdistan Region of Iraq. To achieve this end, the mixed methods represented in a questionnaire survey and semi-structured interviews to collect the data in the framework of the case study were chosen. The questionnaire instrument already has been tested. The results of the study revealed that the importance of management commitment and allocate resources, ethical train the workforce and ethical instructions as the critical success issues of lean implementation. Based on the findings, the organization managements are recommended to provide financial and moral support to employees to enable a successful implementation of lean manufacturing aimed at obtaining the desired results of them.

[1]  Chris McKellen Total Productive Maintenance , 2005 .

[2]  Katharina Weiss,et al.  Improving Safety Culture A Practical Guide , 2016 .

[3]  Jiju Antony,et al.  Critical success factors for the effective implementation of Lean Sigma , 2012 .

[4]  Monica Rolfsen,et al.  Successful maintenance practice through team autonomy , 2012 .

[5]  Gill Christy,et al.  Management and Organisational Behaviour , 1985 .

[6]  Joseph T. Mahoney,et al.  The Evolution of a Manufacturing System at Toyota , 1999 .

[7]  M. Dadashzadeh,et al.  The Impact Of Organizational Factors On Implementation Outcomes Of Lean Manufacturing , 2017 .

[8]  Patrick Graupp,et al.  Implementing TWI: Creating and Managing a Skills-Based Culture , 2010 .

[9]  H. Ahmad.,et al.  Determining Sample Size for Research Activities , 2017 .

[10]  A. Lima-de-Faria Maintenance of organization , 2003 .

[11]  Inderpreet Singh Ahuja,et al.  Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry , 2008 .

[12]  Jayant Rajgopal,et al.  Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .

[13]  藤本 隆宏,et al.  The evolution of a manufacturing system at Toyota , 1999 .

[14]  James D. Westphal,et al.  Customization or Conformity? An Institutional and Network Perspective on the Content and Consequences of TQM Adoption , 1997 .

[15]  Bert Teeuwen,et al.  Lean for the Public Sector: The Pursuit of Perfection in Government Services , 2010 .

[16]  Toni L. Doolen,et al.  Organizational structure, employee problem solving, and lean implementation , 2015 .

[17]  Mohamed Ben-Daya,et al.  Handbook of maintenance management and engineering , 2009 .

[18]  Charles J. Robinson,et al.  Implementing TPM: The North American Experience , 1995 .

[19]  Mohammad Reza Enaghani,et al.  The Relationship between Lean and TPM , 2009 .

[20]  R. Schroeder,et al.  The impact of total productive maintenance practices on manufacturing performance , 2001 .

[21]  Tamer H. Haddad The Applicability of Total Productive Maintenance for Healthcare Facilities: an Implementation Methodology , 2012 .

[22]  R. Sims The challenge of ethical behavior in organizations , 1992 .

[23]  Azharul Karim,et al.  A methodology for effective implementation of lean strategies and its performance evaluation in manufacturing organizations , 2013, Bus. Process. Manag. J..

[24]  Elaine Aspinwall,et al.  TPM implementation in large and medium size organisations , 2013 .

[25]  Nicola Bateman,et al.  Lean Evolution: Lessons from the Workplace , 2006 .

[26]  G. Pisano,et al.  Beyond World-Class : The New Manufacturing Strategy , 1994 .

[27]  A. Rymaszewska The challenges of lean manufacturing implementation in SMEs , 2014 .

[28]  Vimlesh Kumar Soni,et al.  Impact of TPM implementation on Indian manufacturing industry , 2014 .

[29]  John K. Gershenson,et al.  Classification scheme for lean manufacturing tools , 2003 .

[30]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[31]  Christopher J. Bourque Implementing an Integrated Performance Management System: The Early Experience of The Ottawa Hospital , 2013 .

[32]  Monica Rossi,et al.  Lean product and process development , 2016 .

[33]  Lincoln Forbes,et al.  Modern Construction : Lean Project Delivery and Integrated Practices , 2010 .

[34]  Ping Yu,et al.  Electronic Health Record , 2012, Encyclopedia of Gerontology and Population Aging.

[35]  P. Garengo,et al.  Lean manufacturing in developing countries: evidence from Indian SMEs , 2012 .

[36]  John Drew,et al.  Journey to lean : making operational change stick , 2004 .

[37]  A. Sohal,et al.  Readiness factors for lean implementation in healthcare settings--a literature review. , 2014, Journal of health organization and management.

[38]  A. Blanc,et al.  Total Productive Maintenance , 1993, International Symposium on Semiconductor Manufacturing.

[39]  Computer Staff,et al.  The Machine That Changed the World , 1992 .

[40]  لطیفی نژاد مرجان,et al.  An Introduction To Total Productive Maintenance(TPM) معرفی نگهداری و تعمیرات جامع , 2005 .

[41]  T. Thompson Managing business ethics , 1991 .

[42]  Vaibhav Gupta,et al.  Application of value stream mapping for lean operations and cycle time reduction: an Indian case study , 2005 .

[43]  Bozena Poksinska,et al.  The Current State of Lean Implementation in Health Care: Literature Review , 2010, Quality management in health care.

[44]  Frank H. Maier,et al.  Implementation and Outcomes of Total Productive Maintenance , 1998 .

[45]  P. G. Saleeshya,et al.  Lean manufacturing practices in textile industries – a case study , 2012 .

[46]  Vathsala Wickramasinghe,et al.  Differences in Organizational Factors by Lean Duration , 2011 .

[47]  N. Anantharaman,et al.  Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system , 2006 .

[48]  Prattana Punnakitikasem,et al.  An investigation of factors affecting lean implementation success of Thai logistics companies , 2013 .

[49]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[50]  Hemlata Sahu,et al.  Implementating Total Productive Maintance In Jamna Auto Industry Malanpur , 2012 .

[51]  S. Mann Research Methods for Business: A Skill-Building Approach , 2013 .

[52]  Pascal Dennis,et al.  Lean Production Simplified : A Plain-Language Guide to the World's Most Powerful Production System , 2002 .