A production planning problem in FMS
暂无分享,去创建一个
[1] L. Escudero. An inexact algorithm for the sequential ordering problem , 1988 .
[2] L. F. Escudero,et al. An inexact algorithm for part input sequencing and scheduling with side constraints in FMS , 1989 .
[3] C. K. Whitney,et al. Sequential decision procedures for batching and balancing in FMSs , 1985 .
[4] Kathryn E. Stecke,et al. Flexible manufacturing systems : operations research models and applications , 1985 .
[5] Robert J. Wittrock,et al. Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..
[6] Kathryn E. Stecke,et al. Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, held at the University of Michigan, Ann Arbor, MI, U.S.A., August 12-15, 1986 , 1986 .
[7] Andrew Kusiak,et al. Integer programming approach to process planning , 1985 .
[8] Ellis L. Johnson,et al. Solving Large-Scale Zero-One Linear Programming Problems , 1983, Oper. Res..
[9] Gerd Finke,et al. MODELING AND SOLVING THE FLEXIBLE FORGING MODULE SCHEDULING PROBLEM , 1987 .
[10] Thomas L. Morin,et al. The optimality of balancing workloads in certain types of flexible manufacturing systems , 1985 .
[11] Randall P. Sadowski,et al. A mixed integer program for loading and scheduling multiple flexible manufacturing cells , 1986 .
[12] Egon Balas,et al. A restricted Lagrangean approach to the traveling salesman problem , 1981, Math. Program..
[13] Paolo Toth,et al. Linear Assignment Problems , 1987 .
[14] Thomas G. Gunn. The Mechanization of Design and Manufacturing. , 1982 .
[15] Gerhard Reinelt,et al. A Cutting Plane Algorithm for the Linear Ordering Problem , 1984, Oper. Res..
[16] A. Fréville,et al. Heuristics and reduction methods for multiple constraints 0-1 linear programming problems , 1986 .
[17] Helmut Engelke,et al. Integrated Manufacturing Modeling System , 1985, IBM J. Res. Dev..
[18] Michael M. Kostreva,et al. Solving 0-1 Integer Programming Problems Arising from Large Scale Planning Models , 1985, Oper. Res..
[19] Kathryn E. Stecke,et al. Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .
[20] M. Padberg,et al. Lp-based combinatorial problem solving , 1985 .
[21] Kathryn E. Stecke,et al. A Hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems , 1986 .
[22] Silvano Martello,et al. Algorithm 595: An Enumerative Algorithm for Finding Hamiltonian Circuits in a Directed Graph , 1983, TOMS.
[23] Robert J. Wittrock,et al. An Adaptable Scheduling Algorithm for Flexible Flow Lines , 1988, Oper. Res..
[24] Kathryn E. Stecke,et al. A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems , 1986 .
[25] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[26] Laurence A. Wolsey,et al. Solving Mixed Integer Programming Problems Using Automatic Reformulation , 1987, Oper. Res..
[27] Kathryn E. Stecke,et al. Heuristic loading algorithms for flexible manufacturing systems , 1983 .