EMI: Engineering and Management Integrator

The impact of systems engineering on program cost has been recognized for over a decade. From the very early stages, careful management of the relationships between the product design and the project plan is crucial to the success of any project that aims to deliver a defined product. Failure to closely manage the intricate web of resource constraints emanating from the two domains, the project scope and the product scope may lead to inadequate product performance or overruns in project schedule and budget. Identifying and managing the relationship between these two domains are at the heart of our challenge to combine project management (PM) and systems engineering (SE). We present a new approach, called EMI, which integrates SE and PM methodologies. These include the EMI mathematical foundation, implementation in architectural optimization and project management tools, and a detailed use case for development of the Doors Management System for commercial aircraft.

[1]  Marcel Mongeau,et al.  Event-based MILP models for resource-constrained project scheduling problems , 2011, Comput. Oper. Res..

[2]  Avraham Shtub,et al.  A Simulation‐Based Approach in Support of Project Management Training for Systems Engineers , 2014, Syst. Eng..

[3]  James D. Herbsleb,et al.  Socio-technical congruence: a framework for assessing the impact of technical and work dependencies on software development productivity , 2008, ESEM '08.

[4]  Lev Greenberg,et al.  Pluggable Analysis Viewpoints for Design Space Exploration , 2013, CSER.

[5]  Alan MacCormack,et al.  Exploring the Duality between Product and Organizational Architectures: A Test of the Mirroring Hypothesis , 2011 .

[6]  Avi Parush,et al.  Simulator-Based Team Training to Share Resources in a Matrix Structure Organization , 2010, IEEE Transactions on Engineering Management.

[7]  Juan Camilo Zapata,et al.  The multimode resource constrained multiproject scheduling problem: Alternative formulations , 2008 .

[8]  Avi Parush,et al.  Simulation-based learning: The learning-forgetting-relearning process and impact of learning history , 2008, Comput. Educ..

[9]  Kevin Forsberg,et al.  The Relationship of System Engineering to the Project Cycle , 1991 .

[10]  Yair Wand,et al.  Emancipating instances from the tyranny of classes in information modeling , 2000, TODS.

[11]  Michael Masin,et al.  Reusable Derivation of Operational Metrics for Architectural Optimization , 2014, CSER.

[12]  Christian Artigues,et al.  Recent developments in mixed integer linear programming formulations for the resource-constrained project scheduling problem , 2014 .

[13]  Pascal Van Hentenryck The OPL optimization programming language , 1999 .

[14]  Avraham Shtub,et al.  Simulation Based Training (SBT) - the Next Generation of Project Management Training , 2013 .

[15]  Mark S. Avnet 1.3.1 Information Flow, Team Coordination, and Shared Knowledge in Integrated Concurrent Engineering , 2014 .

[16]  Avraham Shtub,et al.  Implementation of Lean Engineering Practices in Projects and Programs through Simulation Based Training , 2014 .

[17]  Lev Greenberg,et al.  1.6.2 Generic Approach for Systems Design Optimization in MBSE1 , 2012 .

[18]  Avi Parush,et al.  Simulation‐based Learning in Engineering Education: Performance and Transfer in Learning Project Management , 2006 .

[19]  Steven D. Eppinger,et al.  Identifying Modular and Integrative Systems and Their Impact on Design Team Interactions , 2003 .

[20]  M. Mongeau,et al.  Mixed-Integer Linear Programming Formulations , 2015 .

[21]  Jürgen Zimmermann,et al.  Handbook on Project Management and Scheduling Vol.1 , 2015 .