The two-stage assembly scheduling problem to minimize total completion time with setup times

[1]  Ali Allahverdi,et al.  The significance of reducing setup times/setup costs , 2008, Eur. J. Oper. Res..

[2]  Jing Liu,et al.  A survey of scheduling problems with setup times or costs , 2008, Eur. J. Oper. Res..

[3]  Tarek Y. ElMekkawy,et al.  Deadlock-free scheduling of flexible job shops with limited capacity buffers , 2008 .

[4]  Emmanuel Neron,et al.  An unrelated parallel machines model for an industrial production resetting problem , 2008 .

[5]  Michel Gourgand,et al.  Modelling and solving a multimode and multisite industrial problem: Lagrangean relaxation and heuristic approaches , 2008 .

[6]  Jorge M. S. Valente Heuristics for the single machine scheduling problem with early and quadratic tardy penalties , 2007 .

[7]  Tarek Y. ElMekkawy,et al.  Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times , 2007 .

[8]  Fawaz S. Al-Anzi,et al.  A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times , 2007, Eur. J. Oper. Res..

[9]  O. V. Krishnaiah Chetty,et al.  Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach , 2007 .

[10]  Bala Ram,et al.  Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups , 2007 .

[11]  P. Lopez,et al.  Climbing depth-bounded discrepancy search for solving hybrid flow shop problems , 2007 .

[12]  Xiaoyun Xu,et al.  Influencing factors of job waiting time variance on a single machine , 2007 .

[13]  Fawaz S. Al-Anzi,et al.  Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times , 2006 .

[14]  V. Perdomo,et al.  Operating Theatre Scheduling Using Lagrangian Relaxation , 2006, 2006 International Conference on Service Systems and Service Management.

[15]  Godfrey C. Onwubolu,et al.  Scheduling flow shops using differential evolution algorithm , 2006, Eur. J. Oper. Res..

[16]  Fawaz S. Al-Anzi,et al.  A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application , 2006, Comput. Oper. Res..

[17]  Fawaz S. Al-Anzi,et al.  A Hybrid Tabu Search Heuristic for the Two-Stage Assembly Scheduling Problem , 2006 .

[18]  Andries Petrus Engelbrecht,et al.  Self-adaptive Differential Evolution , 2005, CIS.

[19]  Xi Sun,et al.  Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling , 2003, Eur. J. Oper. Res..

[20]  Ali Tozkapan,et al.  A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem , 2003, Comput. Oper. Res..

[21]  Mohamed Haouari,et al.  Optimal scheduling of the 3-machine assembly-type flow shop , 1999, RAIRO Oper. Res..

[22]  Jatinder N. D. Gupta,et al.  A review of scheduling research involving setup considerations , 1999 .

[23]  C. Potts,et al.  A branch and bound algorithm for the two-stage assembly scheduling problem , 1997 .

[24]  Chris N. Potts,et al.  The Two-Stage Assembly Scheduling Problem: Complexity and Approximation , 1995, Oper. Res..

[25]  Chung-Yee Lee,et al.  Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .

[26]  Ravi Sethi,et al.  The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..