Scheduling of a flexible job‐shop using a multi‐objective genetic algorithm
暂无分享,去创建一个
[1] 陳春龍,et al. Designing a tabu search algorithm for the two-stage flow shop problem with secondary criterion , 1999 .
[2] Fayez F. Boctor,et al. The G-group heuristic to solve the multi-product, sequencing, lot sizing and scheduling problem in flow shops , 2001 .
[3] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[4] Felix T.S. Chan,et al. Flexible job-shop scheduling problem under resource constraints , 2006 .
[5] D. E. Goldberg,et al. Genetic Algorithms in Search , 1989 .
[6] Seok Jin Lim,et al. Hybrid approach to production scheduling using genetic algorithm and simulation , 2006 .
[7] Pei-Chann Chang,et al. Adaptive multi-objective genetic algorithms for scheduling of drilling operation in printed circuit board industry , 2007, Appl. Soft Comput..
[8] C. Rajendran,et al. A simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs-a case study , 1997 .
[9] Andrew Y. C. Nee,et al. Application of genetic algorithm to computer-aided process planning in distributed manufacturing environments , 2005 .
[10] Daniel A. Finke,et al. Multiple machine JIT scheduling: a tabu search approach , 2007 .
[11] Carlos A. Coello Coello,et al. Cultural algorithms, an alternative heuristic to solve the job shop scheduling problem , 2007 .
[12] I. Mahdavi,et al. SOLVING THE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM BY A GENETIC ALGORITHM , 2008 .
[13] C. Rajendran,et al. A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs , 2006 .
[14] Ling Wang,et al. Determining optimal combination of genetic operators for flow shop scheduling , 2006 .
[15] Ling Wang,et al. An adaptive genetic algorithm with multiple operators for flowshop scheduling , 2006 .
[16] S. Zolfaghari,et al. Jointly solving the group scheduling and machining speed selection problems: A hybrid tabu search and simulated annealing approach , 1999 .
[17] Yoonho Seo,et al. Evolutionary algorithm for advanced process planning and scheduling in a multi-plant , 2005, Comput. Ind. Eng..