Application of interpretive structural modelling for analysis of factors influencing lean remanufacturing practices

The contemporary manufacturing scenario witnesses the adoption of lean remanufacturing concepts in a concerted manner. Lean remanufacturing is a newly evolved manufacturing process concerned with manufacturing and remanufacturing of products to effectively utilise available energy and resources, while reducing wastes in the process and thereby increasing efficiency. The advantages include process streamlining coupled with end-of-life decisions. A structural model needs to be developed to clarify the interrelationships among factors influencing lean remanufacturing practices. In this study, interpretive structural modelling method has been used to develop the structural model depicting interrelationships and most dominant and least dominant factors. Twenty factors are being identified based on expert opinion from 35 Indian automotive component remanufacturing organisations. The identified most dominant factors include a strong top management commitment with proper strategy selection, long-term vision and participation and a strong understanding of the current product and process designs. MICMAC analysis has been conducted to categorise the factors. The inferences based on the study have been derived. The novel aspect of this study is that it presents the development of structural model to identify the most dominant factors influencing the implementation of lean remanufacturing principles.

[1]  Erik Sundin,et al.  Toward Pull Remanufacturing: A Case Study on Material and Information Flow Uncertainties at a German Engine Remanufacturer , 2015 .

[2]  E. Sundin,et al.  Making functional sales environmentally and economically beneficial through product remanufacturing , 2005 .

[3]  Ramesh Subramoniam,et al.  Lean Engineering Implementation Challenges for Automotive Remanufacturing , 2009 .

[4]  W. Wong,et al.  Challenges of Lean Manufacturing Implementation : A Hierarchical Model , 2012 .

[5]  Robert W. Grubbström,et al.  Optimal production opportunities in a remanufacturing system , 2006 .

[6]  Ravi Shankar,et al.  An ISM approach for modelling the enablers of flexible manufacturing system: the case for India , 2008 .

[7]  Johan Östlin,et al.  On Remanufacturing Systems : Analysing and Managing Material Flows and Remanufacturing Processes , 2008 .

[8]  John W. Sutherland,et al.  A comparison of manufacturing and remanufacturing energy intensities with application to diesel engine production , 2008 .

[9]  Albert Corominas,et al.  Optimal manufacturing-remanufacturing policies in a lean production environment , 2008, Comput. Ind. Eng..

[10]  Kannan Govindan,et al.  Application of fuzzy analytic network process for barrier evaluation in automotive parts remanufacturing towards cleaner production – a study in an Indian scenario , 2016 .

[11]  Martin Charter,et al.  Remanufacturing and product design , 2008 .

[12]  Rodriguez,et al.  Cell Layout Application in Product Recovery: A Lean Proposal to Increase Efficiency in Remanufacturing , 2011 .

[13]  William Dairymple The Case for India , 2006 .

[14]  Changmuk Kang,et al.  Dynamic Disassembly Planning for Remanufacturing of Multiple Types of Products , 2010 .

[15]  Bert Bras,et al.  Issues in the Automotive Parts Remanufacturing Industry - A Discussion of Results from Surveys Performed among Remanufacturers , 1998 .

[16]  Sandeep Mondal,et al.  Analysis of issues relating to remanufacturing technology – a case of an Indian company , 2009, Technol. Anal. Strateg. Manag..

[17]  M. H. Wang,et al.  ECONOMICAL EVALUATION OF DISASSEMBLY OPERATIONS FOR RECYCLING, REMANUFACTURING AND REUSE , 1998 .

[18]  Shaligram Pokharel,et al.  A hybrid approach using ISM and fuzzy TOPSIS for the selection of reverse logistics provider , 2009 .

[19]  Sandeep Grover,et al.  An ISM approach for modelling the enablers in the implementation of Total Productive Maintenance (TPM) , 2013, Int. J. Syst. Assur. Eng. Manag..

[20]  Rolf Steinhilper,et al.  Exploring New Horizons for Remanufacturing an Up-to-date Overview of Industries, Products and Technologies , 2015 .

[21]  Erik Sundin,et al.  MINIMUM TIME FOR MATERIAL AND INFORMATION FLOWS ANALYSIS (MINIMIFA) - A METHOD TO IDENTIFY CHALLENGES AND IMPROVEMENT OPPORTUNITIES , 2014 .

[22]  Robert James Kucner,et al.  A socio-technical study of lean manufacturing deployment in the remanufacturing context , 2008 .

[23]  Bert Bras Remanufacturing: Product Design , 2015 .

[24]  S. Vinodh,et al.  Development of a methodology to evaluate lean remanufacturing characteristics in a manufacturing organisation , 2015 .

[25]  Erik Sundin,et al.  Challenges and Opportunities of Lean Remanufacturing , 2014, Int. J. Autom. Technol..

[26]  K. Mathiyazhagan,et al.  Analysis of the influential pressures for green supply chain management adoption—an Indian perspective using interpretive structural modeling , 2013 .

[27]  John S. Usher,et al.  Production planning for remanufactured products , 2007 .

[28]  Magdalene Andrew-Munot,et al.  Development and analysis of mathematical and simulation models of decision-making tools for remanufacturing , 2013 .

[29]  James B. Ayers Encyclopedia of supply chain management , 2012 .

[30]  Erik Sundin,et al.  How Can Remanufacturing Processes Become Leaner , 2006 .

[31]  K. Jo Min,et al.  Remanufacturing decisions and implications under material cost uncertainty , 2015 .

[32]  J. Ostlin,et al.  Lean Production Principles in Remanufacturing A Case Study at a Toner Cartridge Remanufacturer , 2007, Proceedings of the 2007 IEEE International Symposium on Electronics and the Environment.

[33]  S. Vinodh,et al.  Application of interpretive structural modelling for analysing the factors influencing integrated lean sustainable system , 2016, Clean Technologies and Environmental Policy.

[34]  R. Guide,et al.  Rough-cut capacity planning for remanufacturing firms , 1997 .

[35]  S. G. Deshmukh,et al.  Selection of Third-Party Logistics (3PL): A Hybrid Approach Using Interpretive Structural Modeling (ISM) and Analytic Network Process (ANP) , 2005 .

[36]  Abid Haleem,et al.  Implementing lean manufacturing system: ISM approach , 2013 .