Guidelines for integrated planning and control of engineer-to-order prefabrication systems

The industrialization of construction processes is an important strategy for improving quality and productivity in construction. However, the adoption of industrialized technologies does not necessarily have a high impact in the overall performance of the production system. In fact, most papers on the implementation of Lean concepts and principles in prefabricated building systems have focused on a particular stage of the construction process, such as design, prefabrication or assembly. This paper is concerned with planning and controlling engineer-to-order (ETO) prefabricated systems, in which a single company is responsible for designing, and prefabricating components, and assembling them on site. This paper reports the preliminary results of an ongoing research project that aims to understand how the assembly process at the construction site can pull the prefabrication of components in a context with high variability. It is based on a study carried out at a steel fabricator company in which an integrated planning and control model has been developed, involving design, prefabrication and site assembly. This paper presents a set of guidelines for devising planning and control systems in such an environment.

[1]  J. Aken Management Research Based on the Paradigm of the Design Sciences: The Quest for Field-Tested and Grounded Technological Rules , 2004 .

[2]  Christopher Earl,et al.  A Typology of UK Engineer-to-Order Companies , 2001 .

[3]  M. Naim,et al.  Engineer-to-order supply chain management: A literature review and research agenda , 2009 .

[4]  Wallace J. Hopp,et al.  To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..

[5]  Lauri Koskela,et al.  In Time at Last - Adaption of Last Planner Tools for the Design Phase of a Building Project , 2012 .

[6]  Iris D. Tommelein,et al.  Is the Last Planner System Applicable to Design? A Case Study , 2009 .

[7]  G. Susman,et al.  An Assessment of the Scientific Merits of Action Research. , 1978 .

[8]  David Little,et al.  Integrated planning and scheduling in the engineer-to-order sector , 2000, Int. J. Comput. Integr. Manuf..

[9]  Tomaso Poggio,et al.  Learning to see , 1996 .

[10]  Eric Furness Creating Level Pull , 2004 .

[11]  Glenn Ballard,et al.  An application of lean concepts and techniques to precast concrete fabrication , 2002 .

[12]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[13]  Terry Williams,et al.  The Need for New Paradigms for Complex Projects , 1999 .

[14]  A. Posner Learning to see. , 1955, Eye, ear, nose & throat monthly.

[15]  Jwm Will Bertrand,et al.  Production control in engineer-to-order firms , 1993 .

[16]  James A. Powell,et al.  AN EXPLORATORY STUDY ON THE APPLICABILITY OF PROCESS TRANSPARENCY IN CONSTRUCTION SITES , 2002 .

[17]  Salvatore T. March,et al.  Design and natural science research on information technology , 1995, Decis. Support Syst..

[18]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[19]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[20]  Joakim Wikner,et al.  Mass customization in terms of the customer order decoupling point , 2004 .

[21]  Greg Howell,et al.  Implementing Lean Construction: Stabilizing Work Flow , 1997 .

[22]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[23]  Glenn Ballard,et al.  Making Prefabrication Lean , 2004 .

[24]  Gregory A. Howell,et al.  An Update on Last Planner , 2003 .