Discussion on counter-digging and backfill methods of low filling soil roadbed

Combining with roadbed counter-digging and backfill engineering at contraction section of national highway line No.208 reconstruction project,this thesis introduces counter-digging and backfill methods of low filling soil roadbed,and summarizes some technological points,which has laid a foundation for the application of counter-digging method in roadbed engineering.