Evaluating and selecting key performance indicators: an ANP-based model

Purpose – Selecting the most meaningful performance indicators, i.e. key performance indicators (KPIs), represents one of the major challenges that companies have to face for developing an effective performance measurement system (PMS). Selecting KPIs can be interpreted as a multiple criteria decision‐making (MCDM) problem, involving a number of factors and related interdependencies. The purpose of this paper is to propose a model, based on the analytic network process (ANP), for driving managers in the selection of KIPs. The model draws upon the consideration that KPIs can be evaluated and selected on the basis of a set of criteria, theoretically founded, and the feedback dependencies between the criteria and performance indicators as well as among indicators.Design/methodology/approach – Based on a review of management literature regarding the information quality required by performance measures, the paper identifies a set of criteria for selecting KIPs. The criteria form the building blocks of the prop...

[1]  Joseph Sarkis,et al.  Quantitative models for performance measurement systems—alternate considerations , 2003 .

[2]  Diane M. Strong,et al.  Beyond Accuracy: What Data Quality Means to Data Consumers , 1996, J. Manag. Inf. Syst..

[3]  F. Partovi An analytic model to quantify strategic service vision , 2001 .

[4]  Joseph Sarkis,et al.  Strategic analysis of logistics and supply chain management systems using the analytical network process , 1998 .

[5]  Marc Holzer Public service: present problems, future prospects , 1989 .

[6]  Shibahashi Masaaki Qualitative Characteristics of Accounting Information , 1986 .

[7]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[8]  Paul R. Niven,et al.  Balanced Scorecard Step-by-Step: Maximizing Performance and Maintaining Results , 2002 .

[9]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[10]  R. Hämäläinen,et al.  The analytic network process in energy policy planning , 1986 .

[11]  Metin Dagdeviren,et al.  Using the fuzzy analytic network process (ANP) for Balanced Scorecard (BSC): A case study for a manufacturing firm , 2010, Expert Syst. Appl..

[12]  Sen-Kuei Liao,et al.  Measure performance of hospitals using analytic network process (ANP) , 2009, Int. J. Bus. Perform. Supply Chain Model..

[13]  Beliz Ozorhon,et al.  Using Analytic Network Process to Predict the Performance of International Construction Joint Ventures , 2007 .

[14]  Richard Y. Wang,et al.  Modeling Information Manufacturing Systems to Determine Information Product Quality Management Scien , 1998 .