Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network

Resource risk caused by specific resource sharing or competition among projects due to resource constraints is a major issue in project portfolio management, which challenges the application of risk analysis methods effectively. This paper presents a methodology by using a fuzzy Bayesian network to assess the project portfolio resource risk, determine critical resource risk factors, and propose risk-reduction strategies. In this method, the project portfolio resource risk factors are first identified by taking project interdependency into consideration, and then the Bayesian network model is developed to analyze the risk level of the identified risk factors in which expert judgments and fuzzy set theory are integrated to determine the probabilities of all risk factors to deal with incomplete risk data and information. To reduce the subjectivity of expert judgments, the expert weights are determined by combining experts’ background and reliability degree of expert judgments. A numerical analysis is used to demonstrate the application of the proposed methodology. The results show that project portfolio resource risks can be analyzed effectively and efficiently. Furthermore, “poor communication and cooperation among projects,” “capital difficulty,” and “lack of sharing technology among projects” are considered the leading factors of the project portfolio resource risk. Risk-reduction strategic decisions based on the results of risk assessment can be made, which provide project managers with a useful method or tool to manage project risks.

[1]  Izack Cohen,et al.  A robust optimization approach for the multi-mode resource-constrained project scheduling problem , 2019, Eur. J. Oper. Res..

[2]  Gary Klein,et al.  The contribution of resource interdependence to IT program performance: A social interdependence perspective , 2011 .

[3]  Wu INTER-ORGANIZATIONAL COOPERATIVE INNOVATION OF PROJECT-BASED SUPPLY CHAINS UNDER CONSIDERATION OF MONITORING SIGNALS , 2015 .

[4]  Omid Kalatpour,et al.  Analysis of human and organizational factors that influence mining accidents based on Bayesian network , 2018, International journal of occupational safety and ergonomics : JOSE.

[5]  Hongwei Zhu,et al.  Quantitative risk analysis on leakage failure of submarine oil and gas pipelines using Bayesian network , 2016 .

[6]  H. Asilian-Mahabadi,et al.  Ranking the occupational incident contributory factors: A Bayesian network model for the petroleum industry , 2020 .

[7]  Faisal Khan,et al.  A hybrid model for human factor analysis in process accidents: FBN-HFACS , 2019, Journal of Loss Prevention in the Process Industries.

[8]  Matti Kaulio,et al.  Project leadership in multi-project settings: Findings from a critical incident study , 2008 .

[9]  Ralf W. Seifert,et al.  Benefits of working capital sharing in supply chains , 2017, J. Oper. Res. Soc..

[10]  Yang Liu,et al.  Human Factors Analysis for Maritime Accidents Based on a Dynamic Fuzzy Bayesian Network , 2020, Risk analysis : an official publication of the Society for Risk Analysis.

[11]  Guangdong Wu,et al.  Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects , 2017 .

[12]  Zohar Laslo,et al.  Resource allocation under uncertainty in a multi-project matrix environment: Is organizational conflict inevitable? , 2008 .

[13]  Omid Kalatpour,et al.  Constructing a Bayesian network model for improving safety behavior of employees at workplaces. , 2017, Applied ergonomics.

[14]  Moonseo Park,et al.  Model-based dynamic resource management for construction projects , 2005 .

[15]  Gholamreza Saeedi,et al.  Developing a New Probabilistic Approach for Risk Analysis, Application in Underground Coal Mining , 2017, Journal of Failure Analysis and Prevention.

[16]  Wu Gao,et al.  The Portfolio Balanced Risk Index Model and Analysis of Examples of Large-Scale Infrastructure Project , 2017, Complex..

[17]  Chen Honghui,et al.  Resource allocation approach to associate business-IT alignment to enterprise architecture design , 2019, Journal of Systems Engineering and Electronics.

[18]  Denis Fedyanin Resource Allocation Mechanisms for the Portfolio of Projects with Concave Utility Functions , 2019, 2019 IEEE 21st Conference on Business Informatics (CBI).

[19]  Albert B. Chambers Evaluation of Work Injuries between Employment Types: A Study of the Oil and Gas Industry , 2015 .

[20]  Nima Khakzad,et al.  Dynamic safety risk analysis of offshore drilling , 2014 .

[21]  Atidel B. Hadj-Alouane,et al.  Dynamic and reactive optimization of physical and financial flows in the supply chain , 2020 .

[22]  Nima Khakzad,et al.  Safety analysis of process systems using Fuzzy Bayesian Network (FBN) , 2019, Journal of Loss Prevention in the Process Industries.

[23]  Laila M. Khodeir,et al.  Identifying key risks in infrastructure projects – Case study of Cairo Festival City project in Egypt , 2019, Ain Shams Engineering Journal.

[24]  Kuokkwee Wee,et al.  A method for root cause analysis with a Bayesian belief network and fuzzy cognitive map , 2015, Expert Syst. Appl..

[25]  Feng Yang,et al.  Multi-criteria project portfolio selection and scheduling problem based on acceptability analysis , 2019, Comput. Ind. Eng..

[26]  Guangdong Wu,et al.  Knowledge collaborative incentive based on inter-organizational cooperative innovation of project-based supply chain , 2013 .

[27]  Neil Genzlinger A. and Q , 2006 .

[28]  Hacene Smadi,et al.  Bayesian Belief Network Used in the Chemical and Process Industry: A Review and Application , 2017, Journal of Failure Analysis and Prevention.

[29]  Bianca B.M. Keers,et al.  Managing risks in public-private partnership formation projects , 2018, International Journal of Project Management.

[30]  C. S Lim,et al.  Criteria of project success: an exploratory re-examination , 1999 .

[31]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[32]  Nuno Gil,et al.  The Effects of Schedule-driven Project Management in Multi-project Environments. , 2012 .

[33]  Reinhard Viertl,et al.  Is it Necessary to Develop a Fuzzy Bayesian Inference , 1987 .

[34]  Omid Solaymani Fard,et al.  On Fuzzy Portfolio Selection Problems: A Parametric Representation Approach , 2017, Complex..

[35]  Hamed Davari-Ardakani,et al.  Multi-mode resource constrained project scheduling and contractor selection: Mathematical formulation and metaheuristic algorithms , 2019, Appl. Soft Comput..

[36]  Suxian Zhang,et al.  The Analysis of Resource Conflicts Based on Hawk and Dove Game in Multi-projects Management , 2012, 2012 Fifth International Joint Conference on Computational Sciences and Optimization.

[37]  Stephen O. Ogunlana,et al.  Quantifying schedule risk in construction projects using Bayesian belief networks , 2009 .

[38]  C. Hwang,et al.  Fuzzy Multiple Attribute Decision Making Methods , 1992 .

[39]  I. Fung,et al.  A Study of Knowledge, Awareness, Practice and Recommendations Among Hong Kong Construction Workers on Using Personal Respiratory Protective Equipment at Risk , 2008 .

[40]  Mladen Radujković,et al.  Risk Breakdown Structure for Construction Projects on Existing Buildings , 2014 .

[41]  Jian-Bo Yang,et al.  Assessing new product development project risk by Bayesian network with a systematic probability generation methodology , 2009, Expert Syst. Appl..

[42]  Yong Hu,et al.  Software project risk analysis using Bayesian networks with causality constraints , 2013, Decis. Support Syst..

[43]  Haibo Hu,et al.  Uncertainty Analysis and Resource Allocation in Construction Project Management , 2018, Engineering Management Journal.

[44]  R. Manjula,et al.  The Effects of Schedule-Driven Project Management in Multi-Project Environments , 2016 .

[45]  Liping Fang,et al.  Risk reduction in a project portfolio , 2017 .

[46]  Kerrie L. Mengersen,et al.  A proposed validation framework for expert elicited Bayesian Networks , 2013, Expert Syst. Appl..

[47]  S. E. Ahmed,et al.  Bayesian Networks and Decision Graphs , 2008, Technometrics.

[48]  Guo Peng,et al.  Constructing interdependent risks network of project portfolio based on bayesian network , 2014, 2014 International Conference on Management Science & Engineering 21th Annual Conference Proceedings.

[49]  M. Hofman,et al.  Project portfolio risk categorisation – factor analysis results , 2022, International Journal of Information Systems and Project Management.

[50]  Luz Stella Cardona-Meza,et al.  Modeling and Simulation of Project Management through the PMBOK® Standard Using Complex Networks , 2017, Complex..

[51]  W. Marsden I and J , 2012 .

[52]  Min Li,et al.  Risk assessment of mine ignition sources using fuzzy Bayesian network , 2019, Process Safety and Environmental Protection.

[53]  Feifei Li,et al.  A multi-agent system for distributed multi-project scheduling with two-stage decomposition , 2018, PloS one.

[54]  Jiujun Cheng,et al.  Time Performance Optimization and Resource Conflicts Resolution for Multiple Project Management , 2016, IEICE Trans. Inf. Syst..

[55]  C. Sutherland,et al.  Mega-projects and sustainability in Durban, South Africa: Convergent or divergent agendas? , 2015 .

[56]  Yongtae Park,et al.  Large engineering project risk management using a Bayesian belief network , 2009, Expert Syst. Appl..

[57]  Mariusz Hofman,et al.  Taxonomy of the project portfolio risks - an empirical investigation , 2017, CENTERIS/ProjMAN/HCist.

[59]  Xinchang Hao,et al.  A hybrid multi-objective EDA for robust resource constraint project scheduling with uncertainty , 2019, Comput. Ind. Eng..

[60]  T. Laine,et al.  Management Control of Project Portfolio Uncertainty: A Managerial Role Perspective , 2014 .

[61]  J. Tamošaitienė,et al.  Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks , 2018 .

[62]  Anders Söderholm,et al.  Project management of unexpected events , 2008 .

[63]  T. Onisawa An application of fuzzy concepts to modelling of reliability analysis , 1990 .

[64]  Ian Jenkinson,et al.  An Offshore Risk Analysis Method Using Fuzzy Bayesian Network , 2009 .

[65]  Geoffrey Qiping Shen,et al.  Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects , 2016 .

[66]  Mohammad Marufuzzaman,et al.  A Bayesian network based approach for modeling and assessing resilience: A case study of a full service deep water port , 2019, Reliab. Eng. Syst. Saf..

[67]  Yiik Diew Wong,et al.  A fuzzy and Bayesian network CREAM model for human reliability analysis – The case of tanker shipping , 2018 .

[68]  S. Spalek,et al.  Shedding New Light on Project Portfolio Risk Management , 2017 .

[69]  T. Runkler,et al.  A set of axioms for defuzzification strategies towards a theory of rational defuzzification operators , 1993, [Proceedings 1993] Second IEEE International Conference on Fuzzy Systems.

[70]  G.-D. Wu,et al.  Project-Based Supply Chain Cooperative Incentive Based on Reciprocity Preference , 2014 .