Scheduling on parallel machines considering job-machine dependency constraints
暂无分享,去创建一个
[1] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[2] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[3] Ravindra K. Ahuja,et al. Network Flows: Theory, Algorithms, and Applications , 1993 .
[4] Peter Brucker,et al. Complexity of scheduling problems with multi-purpose machines , 1997, Ann. Oper. Res..
[5] W. A. Horn. Technical Note - Minimizing Average Flow Time with Parallel Machines , 1973, Oper. Res..
[6] Han Hoogeveen,et al. Complexity of Scheduling Multiprocessor Tasks with Prespecified Processor Allocations , 1994, Discret. Appl. Math..
[7] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[8] Edward G. Coffman,et al. Scheduling independent tasks to reduce mean finishing time , 1974, CACM.
[9] Jayme Luiz Szwarcfiter,et al. Scheduling unit time jobs with integer release dates to minimize the weighted number of tardy jobs , 2009, Ann. Oper. Res..
[10] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .