DEMONSTRATIVE VERIFICATION STUDY FOR THE NEXT GENERATION PRODUCTION MODEL: APPLICATION OF THE ADVANCED TOYOTA PRODUCTION SYSTEM
暂无分享,去创建一个
[1] Kakuro Amasaka,et al. Availability and Reliability Information Administration System "ARIM-BL" by Methodology in "Inline-Online SQC" , 1998 .
[2] Kakuro Amasaka. HIGHLY RELIABLE CAE MODEL, THE KEY TO STRATEGIC DEVELOPMENT OF ADVANCED TDS , 2007 .
[3] Kakuro Amasaka,et al. HUMAN DIGITAL PIPELINE METHOD USING TOTAL LINKAGE THROUGH DESIGN TO MANUFACTURING , 2007 .
[4] Kakuro Amasaka. "New JIT": A new management technology principle at Toyota , 2002 .
[5] Kakuro Amasaka,et al. "V-MICS", ADVANCED TPS FOR STRATEGIC PRODUCTION ADMINISTRATION: INNOVATIVE MAINTENANCE COMBINING DB AND CG , 2005 .
[6] Kakuro Amasaka,et al. The robot reliability design and improvement method and the advanced Toyota production system , 2007, Ind. Robot.
[7] Kakuro Amasaka,et al. TPS-LAS MODEL USING PROCESS LAYOUT CAE SYSTEM AT TOYOTA: ADVANCED TPS, KEY TO GLOBAL PRODUCTION STRATEGY NEW JIT , 2006 .
[8] Zhengdong Huang,et al. INTEGRATION OF REAL-TIME CONTROL SIMULATION TO A VIRTUAL MANUFACTURING ENVIRONMENT , 2002 .
[9] Rade Tesic,et al. MOTION MODELING CONCEPTS IN VIRTUAL MANUFACTURING SIMULATOR , 2002 .
[10] Engelbert Westkämper,et al. VIRTUAL REALITY FOR SUPPORTING THE CONFIGURATION OF TRANSFORMABLE ASSEMBLY SYSTEMS , 2002 .
[11] Kakuro Amasaka,et al. IMPROVING THE RELIABILITY OF BODY ASSEMBLY LINE EQUIPMENT , 1996 .
[12] H. Sakai,et al. Development of a robot control method for curved seal extrusion for high productivity in an advanced Toyota production system , 2007, Int. J. Comput. Integr. Manuf..