건설사업에서의 VE 확대 방안에 관한 연구

Because regulation that can apply VE in design phase to Construction Skill Management Law recently is readied, VE is embossed again, but the actual state is condition that don't have VE activity and big variance past still. The purpose of this study that see hereupon maximizes VE's potential energy and with VE activity in domestic construction, VE is armed and studied way that develop inside and outside of the country competitive power through conversion of cognition. VE is investigated With the examination of past studies. Application present condition of VE techniques and problems are derived from owner, cm, designer, contractor by questionnaire survey, and it indicates method of the VE promotion. VE has difference between theory and application and efficient fixing of VE was real condition that is not achieved. According to this extension of VE object, diversification of delivery system, development of program, compensation system and competition activation way present.Also, expect that may gain synergy effect if become practical use with other proposal system.