An imperfect multi-product production system with rework
暂无分享,去创建一个
Ata Allah Taleizadeh | T.-C. Kuo | H. M. Wee | S.Gh. Jalali-Naini | H. Wee | A. Taleizadeh | T. Kuo | S.Gh. Jalali-Naini
[1] R. Haji,et al. Optimal batch production with minimum rework cycles and constraint on accumulated defective units , 2009, 2009 IEEE/INFORMS International Conference on Service Operations, Logistics and Informatics.
[2] Bhaba R. Sarker,et al. Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..
[3] M. K. Salameh,et al. Economic production quantity model for items with imperfect quality , 2000 .
[4] Samiran Chattopadhyay,et al. An inventory model of two-warehouse system with variable demand dependent on instantaneous displayed stock and marketing decisions via hybrid RCGA , 2011 .
[5] Maurice Bonney,et al. An economic order quantity model for an imperfect production process with entropy cost , 2009 .
[6] Yuan-Shyi Peter Chiu,et al. A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns" , 2007, Eur. J. Oper. Res..
[7] Jonas C. P. Yu,et al. Optimal inventory model for items with imperfect quality and shortage backordering , 2007 .
[8] Seyed Taghi Akhavan Niaki,et al. A parameter-tuned genetic algorithm to solve multi-product economic production quantity model with defective items, rework, and constrained space , 2010 .
[9] Alireza Haji,et al. The effect of inspection errors on the optimal batch size in reworkable production systems with scraps , 2010 .
[10] C. Chung,et al. Economic production quantity model for deteriorating inventory with random machine unavailability and shortage , 2011 .
[11] Shey-Huei Sheu,et al. Production , Manufacturing and Logistics Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance , 2008 .
[12] Mehdi Bijari,et al. Effects of imperfect products on lot sizing with work in process inventory , 2011, Appl. Math. Comput..
[13] Shib Sankar Sana,et al. A production-inventory model in an imperfect production process , 2010, Eur. J. Oper. Res..
[14] Hung-Chi Chang,et al. An application of fuzzy sets theory to the EOQ model with imperfect quality items , 2004, Comput. Oper. Res..
[15] H. Wee,et al. An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation , 2007 .
[16] Bhaba R. Sarker,et al. Optimal batch sizing in a multi-stage production system with rework consideration , 2008, Eur. J. Oper. Res..
[17] Hui-Ming Wee,et al. A collaborative inventory system with permissible delay in payment for deteriorating items , 2006, Math. Comput. Model..
[18] Hui-Ming Wee,et al. Green-product-design value and information-technology investment on replenishment model with remanufacturing , 2010, Int. J. Comput. Integr. Manuf..
[19] S. T. A. Niaki,et al. Multiproduct EPQ model with single machine, backordering and immediate rework process , 2011 .
[20] Leopoldo Eduardo Cárdenas-Barrón,et al. Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..
[21] Rasoul Haji,et al. Lot sizing with non-zero setup times for rework , 2008 .
[22] H. Wee. Deteriorating inventory model with quantity discount, pricing and partial backordering , 1999 .
[23] Ata Allah Taleizadeh,et al. Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint , 2010, J. Comput. Appl. Math..
[24] Hui-Ming Wee,et al. Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives , 2007, Eur. J. Oper. Res..
[25] Hui-Ming Wee,et al. Multi-product production quantity model with repair failure and partial backordering , 2010, Comput. Ind. Eng..
[26] Seung Ho Yoo,et al. Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return , 2009 .
[27] Hui-Ming Wee,et al. OPTIMAL ORDERING POLICY FOR A DETERIORATING ITEM WITH IMPERFECT QUALITY AND PARTIAL BACKORDERING , 2005 .
[28] Rasoul Haji,et al. Optimal batch production with rework and non-zero setup cost for rework , 2009, 2009 International Conference on Computers & Industrial Engineering.
[29] S. M. Ghoreyshi,et al. Batch sizing with random yield and imperfect inspection and process compressibility , 2010, The 40th International Conference on Computers & Indutrial Engineering.
[30] H.-M. Wee,et al. Optimising replenishment policy for an integrated production inventory deteriorating model considering green component-value design and remanufacturing , 2009 .
[31] Amir Abbas Najafi,et al. ECONOMIC PRODUCTION QUANTITY MODEL WITH SCRAPPED ITEMS AND LIMITED PRODUCTION CAPACITY , 2010 .
[32] L. Cárdenas-Barrón,et al. Note on: Economic production quantity model for items with imperfect quality – a practical approach , 2002 .
[33] Haji Rasoul,et al. OPTIMAL BATCH PRODUCTION FOR A SINGLE MACHINE SYSTEM WITH ACCUMULATED DEFECTIVES AND RANDOM RATE OF REWORK , 2010 .
[34] Yuan-Shyi Peter Chiu,et al. Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..
[35] Sanjoy Kumar Paul,et al. An artificial neural network model for optimization of finished goods inventory , 2011 .