MINIMIZING WORK OVERLOAD IN MIXED-MODEL ASSEMBLY LINES
暂无分享,去创建一个
[1] Katsuhisa Ohno,et al. Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages , 2000, Eur. J. Oper. Res..
[2] Yasuhiro Monden,et al. Bicriteria sequencing for just-in-time mixed-model assembly lines , 2000 .
[3] Katsuhisa Ohno,et al. Algorithms for sequencing mixed models on an assembly line in a JIT production system , 1997 .
[4] Bhaba R. Sarker,et al. Designing a mixed-model assembly line to minimize the costs of idle and utility times , 1998 .
[5] Armin Scholl,et al. Pattern Based Vocabulary Building for Effectively Sequencing Mixed-Model Assembly Lines , 1998, J. Heuristics.
[6] T. Ito,et al. Sequencing problem for a mixed-model assembly line in the Toyota production system , 2004 .
[7] Marimuthu Palaniswami,et al. Traditional heuristic versus Hopfield neural network approaches to a car sequencing problem , 1996 .
[8] Candace Arai Yano,et al. Survey, development, and applications of algorithms for sequencing paced assembly lines , 1989 .
[9] L. Tsai. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage , 1995 .
[10] Joaquín Bautista,et al. Heuristics and exact algorithms for solving the Monden problem , 1996 .
[11] A. Bolat,et al. Efficient methods for sequencing minimum job sets on mixed model assembly lines , 1997 .
[12] Sedef Meral,et al. Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems , 2001, Eur. J. Oper. Res..
[13] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[14] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[15] Yeongho Kim,et al. A genetic alorithm for multiple objective sequencing problems in mixed model assembly lines , 1998 .
[16] H Aigbedo,et al. A PARAMETRIC PROCEDURE FOR MULTICRITERION SEQUENCE SCHEDULING FOR JUSTIN-TIME MIXED-MODEL ASSEMBLY LINES , 1997 .
[17] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[18] Candace Arai Yano,et al. A surrogate objective for utility work in paced assembly lines Ahmet Bolat, Candace Arai Yano. , 1992 .
[19] Candace Arai Yano,et al. Scheduling algorithms to minimize utility work at a single station on a paced assembly line , 1992 .
[20] John B. Kidd,et al. Toyota Production System , 1993 .