Train design and routing optimization for evaluating criticality of freight railroad infrastructures
暂无分享,去创建一个
Mingzhou Jin | Abdullah Al Khaled | David B. Clarke | M. A. Hoque | Mohammad A. Hoque | Mingzhou Jin | D. Clarke | A. A. Khaled
[1] Cynthia Barnhart,et al. Constructing Railroad Blocking Plans to Minimize Handling Costs , 1998, Transp. Sci..
[2] Mark H. Keaton,et al. Designing Railroad Operating Plans: A Dual Adjustment Method for Implementing Lagrangian Relaxation , 1992, Transp. Sci..
[3] Tal Raviv,et al. Service-Oriented Line Planning and Timetabling for Passenger Trains , 2013, Transp. Sci..
[4] Louis Anthony Cox,et al. Wiley encyclopedia of operations research and management science , 2011 .
[5] Ali E. Haghani,et al. Rail freight transportation: A review of recent optimization models for train routing and empty car distribution , 1987 .
[6] Ravindra K. Ahuja,et al. Network Models in Railroad Planning and Scheduling , 2005 .
[7] E. R. Petersen. Railyard Modeling: Part II. The Effect of Yard Facilities on Congestion , 1977 .
[8] Arjang A. Assad,et al. Modelling of rail networks: Toward a routing/makeup model , 1980 .
[9] Malachy Carey,et al. A model and strategy for train pathing with choice of lines, platforms, and routes , 1994 .
[10] Arjang A. Assad,et al. MODELS FOR RAIL TRANSPORTATION , 1980 .
[11] F. Stodolsky,et al. Railroad and locomotive technology roadmap. , 2003 .
[12] C. Tyler Dick,et al. Comparison of Capacity Expansion Strategies for Single-Track Railway Lines with Sparse Sidings , 2014 .
[13] Arjang A. Assad,et al. Analytical Models In Rail Transportation: An Annotated Bibliography , 1981 .
[14] Ravindra K. Ahuja,et al. New approaches for solving the block‐to‐train assignment problem , 2008, Networks.
[15] Lucas P. Veelenturf,et al. An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .
[16] Leishan Zhou,et al. Multi-route railroad blocking problem by improved model and ant colony algorithm in real world , 2011, Comput. Ind. Eng..
[17] Paolo Toth,et al. A Survey of Optimization Models for Train Routing and Scheduling , 1998, Transp. Sci..
[18] Paolo Toth,et al. Optimization Problems in Passenger Railway Systems , 2011 .
[19] Vernon A. Williams. Surface Transportation Board , 2007 .
[20] Marin Marinov,et al. A simulation modelling methodology for evaluating flat-shunted yard operations , 2009, Simul. Model. Pract. Theory.
[21] Ali E. Haghani,et al. Formulation and solution of a combined train routing and makeup, and empty car distribution model , 1989 .
[22] Alexandra M. Newman,et al. Scheduling Trains and Containers with Due Dates and Dynamic Arrivals , 2001, Transp. Sci..
[23] Hong Jin,et al. Railroad Blocking: A Network Design Application , 2000, Oper. Res..
[24] Ángel Marín,et al. Tactical design of rail freight networks. Part I: Exact and heuristic methods , 1996 .
[25] Mark H. Keaton,et al. Designing optimal railroad operating plans: Lagrangian relaxation and heuristic approaches , 1989 .
[26] Michael Francis Gorman,et al. An application of genetic and tabu searches to the freight railroad operating plan problem , 1998, Ann. Oper. Res..
[27] Stacy Cagle Davis,et al. Transportation Energy Data Book: Edition 31 , 2012 .
[28] Yung-Cheng Lai,et al. Enhanced Parametric Railway Capacity Evaluation Tool , 2009 .
[29] Warren B. Powell,et al. Subgradient Methods for the Service Network Design Problem , 1994, Transp. Sci..
[30] Phil Ireland,et al. The Canadian Pacific Railway Transforms Operations by Using Models to Develop Its Operating Plans , 2004, Interfaces.
[31] Lance R Grenzeback,et al. Development of a Rail Freight Demand Model for the National Rail Freight Infrastructure Capacity and Investment Study , 2007 .
[32] Jun Zhao,et al. A column generation based approach for the Train Network Design Optimization problem , 2013 .
[33] Mark S. Daskin,et al. Queuing Models of Classification and Connection Delay in Railyards , 1982 .
[34] Joseph M. Sussman,et al. Routing and scheduling temporal and heterogeneous freight car traffic on rail networks , 1998 .
[35] Krishna C. Jha,et al. New approaches for solving the block-to-train assignment problem , 2008 .
[36] Jian Liu,et al. Solving Real-Life Railroad Blocking Problems , 2007, Interfaces.
[37] Per Olov Lindberg,et al. Railway Timetabling Using Lagrangian Relaxation , 1998, Transp. Sci..
[38] Mark E. Meitzen,et al. A Study of Competition in the U.S. Freight Railroad Industry and Analysis of Proposals that Might Enhance Competition. Executive Summary , 2008 .