Train design and routing optimization for evaluating criticality of freight railroad infrastructures

Freight transportation by railroads is an integral part of the U.S. economy. Identifying critical rail infrastructures can help stakeholders prioritize protection initiatives or add necessary redundancy to maximize rail network resiliency. The criticality of an infrastructure element, link or yard, is based on the increased cost (delay) incurred when that element is disrupted. An event of disruption can cause heavy congestion so that the capacity at links and yards should be considered when freight is re-routed. This paper proposes an optimization model for making-up and routing of trains in a disruptive situation to minimize the system-wide total cost, including classification time at yards and travel time along links. Train design optimization seeks to determine the optimal number of trains, their routes, and associated blocks, subject to various capacity and operational constraints at rail links and yards. An iterative heuristic algorithm is proposed to attack the computational burden for real-world networks. The solution algorithm considers the impact of volume on travel time in a congested or near-congested network. The proposed heuristics provide quality solutions with high speed, demonstrated by numerical experiments for small instances. A case study is conducted for the network of a major U.S. Class-I railroad based on publicly available data. The paper provides maps showing the criticality of infrastructure in the study area from the viewpoint of strategic planning.

[1]  Cynthia Barnhart,et al.  Constructing Railroad Blocking Plans to Minimize Handling Costs , 1998, Transp. Sci..

[2]  Mark H. Keaton,et al.  Designing Railroad Operating Plans: A Dual Adjustment Method for Implementing Lagrangian Relaxation , 1992, Transp. Sci..

[3]  Tal Raviv,et al.  Service-Oriented Line Planning and Timetabling for Passenger Trains , 2013, Transp. Sci..

[4]  Louis Anthony Cox,et al.  Wiley encyclopedia of operations research and management science , 2011 .

[5]  Ali E. Haghani,et al.  Rail freight transportation: A review of recent optimization models for train routing and empty car distribution , 1987 .

[6]  Ravindra K. Ahuja,et al.  Network Models in Railroad Planning and Scheduling , 2005 .

[7]  E. R. Petersen Railyard Modeling: Part II. The Effect of Yard Facilities on Congestion , 1977 .

[8]  Arjang A. Assad,et al.  Modelling of rail networks: Toward a routing/makeup model , 1980 .

[9]  Malachy Carey,et al.  A model and strategy for train pathing with choice of lines, platforms, and routes , 1994 .

[10]  Arjang A. Assad,et al.  MODELS FOR RAIL TRANSPORTATION , 1980 .

[11]  F. Stodolsky,et al.  Railroad and locomotive technology roadmap. , 2003 .

[12]  C. Tyler Dick,et al.  Comparison of Capacity Expansion Strategies for Single-Track Railway Lines with Sparse Sidings , 2014 .

[13]  Arjang A. Assad,et al.  Analytical Models In Rail Transportation: An Annotated Bibliography , 1981 .

[14]  Ravindra K. Ahuja,et al.  New approaches for solving the block‐to‐train assignment problem , 2008, Networks.

[15]  Lucas P. Veelenturf,et al.  An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .

[16]  Leishan Zhou,et al.  Multi-route railroad blocking problem by improved model and ant colony algorithm in real world , 2011, Comput. Ind. Eng..

[17]  Paolo Toth,et al.  A Survey of Optimization Models for Train Routing and Scheduling , 1998, Transp. Sci..

[18]  Paolo Toth,et al.  Optimization Problems in Passenger Railway Systems , 2011 .

[19]  Vernon A. Williams Surface Transportation Board , 2007 .

[20]  Marin Marinov,et al.  A simulation modelling methodology for evaluating flat-shunted yard operations , 2009, Simul. Model. Pract. Theory.

[21]  Ali E. Haghani,et al.  Formulation and solution of a combined train routing and makeup, and empty car distribution model , 1989 .

[22]  Alexandra M. Newman,et al.  Scheduling Trains and Containers with Due Dates and Dynamic Arrivals , 2001, Transp. Sci..

[23]  Hong Jin,et al.  Railroad Blocking: A Network Design Application , 2000, Oper. Res..

[24]  Ángel Marín,et al.  Tactical design of rail freight networks. Part I: Exact and heuristic methods , 1996 .

[25]  Mark H. Keaton,et al.  Designing optimal railroad operating plans: Lagrangian relaxation and heuristic approaches , 1989 .

[26]  Michael Francis Gorman,et al.  An application of genetic and tabu searches to the freight railroad operating plan problem , 1998, Ann. Oper. Res..

[27]  Stacy Cagle Davis,et al.  Transportation Energy Data Book: Edition 31 , 2012 .

[28]  Yung-Cheng Lai,et al.  Enhanced Parametric Railway Capacity Evaluation Tool , 2009 .

[29]  Warren B. Powell,et al.  Subgradient Methods for the Service Network Design Problem , 1994, Transp. Sci..

[30]  Phil Ireland,et al.  The Canadian Pacific Railway Transforms Operations by Using Models to Develop Its Operating Plans , 2004, Interfaces.

[31]  Lance R Grenzeback,et al.  Development of a Rail Freight Demand Model for the National Rail Freight Infrastructure Capacity and Investment Study , 2007 .

[32]  Jun Zhao,et al.  A column generation based approach for the Train Network Design Optimization problem , 2013 .

[33]  Mark S. Daskin,et al.  Queuing Models of Classification and Connection Delay in Railyards , 1982 .

[34]  Joseph M. Sussman,et al.  Routing and scheduling temporal and heterogeneous freight car traffic on rail networks , 1998 .

[35]  Krishna C. Jha,et al.  New approaches for solving the block-to-train assignment problem , 2008 .

[36]  Jian Liu,et al.  Solving Real-Life Railroad Blocking Problems , 2007, Interfaces.

[37]  Per Olov Lindberg,et al.  Railway Timetabling Using Lagrangian Relaxation , 1998, Transp. Sci..

[38]  Mark E. Meitzen,et al.  A Study of Competition in the U.S. Freight Railroad Industry and Analysis of Proposals that Might Enhance Competition. Executive Summary , 2008 .