Minimizing total weighted completion time in a proportionate flow shop
暂无分享,去创建一个
Han Hoogeveen | Michael Pinedo | Natalia V. Shakhlevich | N. V. Shakhlevich | Michael Pinedo | H. Hoogeveen
[1] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[2] V. S. Tanaev,et al. Scheduling Theory: Multi-Stage Systems , 1994 .
[3] Michael Pinedo. A Note on Stochastic Shop Models in Which Jobs have the Same Processing Requirements on Each Machine , 1985 .
[4] Peng Si Ow,et al. Focused Scheduling in Proportionate Flowshops , 1985 .
[5] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[6] A. Nouweland,et al. Flow-shops with a dominant machine , 1992 .
[7] S. S. Panwalkar,et al. An ordered flow-shop sequencing problem with mean completion time criterion† , 1976 .