Optimization procedures for simultaneous road rehabilitation and bridge replacement decisions in highway networks
暂无分享,去创建一个
[1] T. Ridley. AN INVESTMENT POLICY TO REDUCE THE TRAVEL TIME IN A TRANSPORTATION NETWORK , 1968 .
[2] Yi Jiang,et al. DYNAMIC OPTIMIZATION MODEL FOR BRIDGE MANAGEMENT SYSTEMS , 1989 .
[3] Illya V. Hicks. Branch decompositions and their applications , 2000 .
[4] F. Glover. A Multiphase-Dual Algorithm for the Zero-One Integer Programming Problem , 1965 .
[5] Alberto Garcia-Diaz,et al. An Investment Staging Model for a Bridge Replacement Problem , 1980, Oper. Res..
[6] Dimitri A. Grivas,et al. STATE INCREMENT OPTIMIZATION METHODOLOGY FOR NETWORK-LEVEL PAVEMENT MANAGEMENT , 1993 .
[7] I. Grossmann,et al. New algorithms for nonlinear generalized disjunctive programming , 2000 .
[9] Mark A. Turnquist,et al. Optimization Modeling for Enhanced Network-Level Pavement Management System , 1996 .
[10] D. Newbery,et al. ROAD DAMAGE EXTERNALITIES AND ROAD USER CHARGES , 1988 .
[11] William D. O. Paterson. Road Deterioration and Maintenance Effects: Models for Planning and Management , 1988 .
[12] Ralph Haas,et al. Integer Programming of Maintenance and Rehabilitation Treatments for Pavement Networks , 1998 .
[13] Judith S. Liebman,et al. Optimal Strategies for Bridge Replacement , 1983 .
[14] Wayne J. Davis,et al. Optimal maintenance decisions for pavement management , 1987 .
[15] A P Chassiakos,et al. Information management in a decision support system for pavement management , 2001 .
[16] P. Watt,et al. A note on estimation of bounds of random variables , 1980 .
[17] P. Brooker,et al. Optimal expansion of an existing network , 1974, Math. Program..