Remanufacturing in automotive industry: Challenges and limitations
暂无分享,去创建一个
[1] L. Wein,et al. Inventory Management of Remanufacturable Products , 2000 .
[2] Geraldo Ferrer,et al. MATERIAL PLANNING FOR A REMANUFACTURING FACILITY , 2001 .
[3] Narsingh Deo,et al. Discrete Optimization Algorithms: with Pascal Programs , 2006 .
[4] Yogesh,et al. Inventory management. , 2018, Hospital gift shop management.
[5] Günther Seliger,et al. Economic and Environmental Assessment of Remanufacturing in the Automotive Industry , 2008 .
[6] Jacqueline M. Bloemhof-Ruwaard,et al. THE IMPACT OF PRODUCT RECOVERY ON LOGISTICS NETWORK DESIGN , 2001 .
[7] Dale S. Rogers,et al. Differences between forward and reverse logistics in a retail environment , 2002 .
[8] R. Dekker,et al. Reverse logistics : quantitative models for closed-loop supply chains , 2004 .
[9] Arkadiusz Kawa,et al. Simulation of Dynamic Supply Chain Configuration Based on Software Agents and Graph Theory , 2009, IWANN.
[10] Gilvan C. Souza. Production Planning and Control for Remanufacturing , 2010 .
[11] K. Peattie,et al. Meeting the Closed-Loop Challenge: The Case of Remanufacturing , 2004 .
[12] Jorge Marx Gómez,et al. The Concept of Closed-loop Supply Chain Integration Through Agents-based System , 2007, ITEE.
[13] Ruud H. Teunter,et al. Matching Demand and Supply to Maximize Profits from Remanufacturing , 2003, Manuf. Serv. Oper. Manag..
[14] Arkadiusz Kawa,et al. Supply Chain Arrangements in Recovery Network , 2010, KES-AMSTA.
[15] Rommert Dekker,et al. A characterisation of logistics networks for product recovery , 2000 .