Peak Operation of Cascaded Hydropower Plants Serving Multiple Provinces

The bulk hydropower transmission via trans-provincial and trans-regional power networks in China provides great operational flexibility to dispatch power resources between multiple power grids. This is very beneficial to alleviate the tremendous peak load pressure of most provincial power grids. This study places the focus on peak operations of cascaded hydropower plants serving multiple provinces under a regional connected AC/DC network. The objective is to respond to peak loads of multiple provincial power grids simultaneously. A two-stage search method is developed for this problem. In the first stage, a load reconstruction strategy is proposed to combine multiple load curves of power grids into a total load curve. The purpose is to deal with different load features in load magnitudes, peaks and valleys. A mutative-scale optimization method is then used to determine the generation schedules of hydropower plants. In the second stage, an exterior point search method is established to allocate the generation among multiple receiving power grids. This method produces an initial solution using the load shedding algorithm, and further improves it by iteratively coordinating the generation among different power grids. The proposed method was implemented to the operations of cascaded hydropower plants on Xin-Fu River and another on Hongshui River. The optimization results in two cases satisfied the peak demands of receiving provincial power grids. Moreover, the maximum load difference between peak and valley decreased 12.67% and 11.32% in Shanghai Power Grid (SHPG) and Zhejiang Power Grid (ZJPG), exceeding by 4.85% and 6.72% those of the current operational method, respectively. The advantage of the proposed method in alleviating peak-shaving pressure is demonstrated.

[1]  Mohammad Hadi Afshar,et al.  Extension of the constrained ant colony optimization algorithms for the optimal operation of multi-reservoir systems , 2013 .

[2]  Bin Xu,et al.  Dynamic Feasible Region Genetic Algorithm for Optimal Operation of a Multi-Reservoir System , 2012 .

[3]  C. Sagastizábal,et al.  Solving the unit commitment problem of hydropower plants via Lagrangian Relaxation and Sequential Quadratic Programming , 2005 .

[4]  E.L. da Silva,et al.  Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming , 2006, IEEE Transactions on Power Systems.

[5]  Shiue Der Lu,et al.  Experimental Research and Control Strategy of Pumped Storage Units Dispatching in the Taiwan Power System Considering Transmission Line Limits , 2013 .

[6]  Z. K. Shawwash,et al.  The B.C. Hydro short term hydro scheduling optimization model , 1999 .

[7]  A. M. Jubril,et al.  Solving Multi-Objective Economic Dispatch Problem Via Semidefinite Programming , 2013, IEEE Transactions on Power Systems.

[8]  Huifeng Zhang,et al.  Optimal Operation of Large-Scale Cascaded Hydropower Systems in the Upper Reaches of the Yangtze River, China , 2014 .

[9]  T.K. Siu,et al.  The BC Hydro short term hydro scheduling optimization model , 1999, Proceedings of the 21st International Conference on Power Industry Computer Applications. Connecting Utilities. PICA 99. To the Millennium and Beyond (Cat. No.99CH36351).

[10]  Chuntian Cheng,et al.  Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head , 2012 .

[11]  Chao-Lung Chiang,et al.  Optimal economic emission dispatch of hydrothermal power systems , 2007 .

[12]  John Samuel Forrest,et al.  A Discussion on recent advances in heavy electrical plant - Ultra-high voltage transmission , 1973, Philosophical Transactions of the Royal Society of London. Series A, Mathematical and Physical Sciences.

[13]  Jianshi Zhao,et al.  Improved Dynamic Programming for Hydropower Reservoir Operation , 2014 .

[14]  A. Immanuel Selvakumar,et al.  Civilized swarm optimization for multiobjective short-term hydrothermal scheduling , 2013 .

[15]  John W. Labadie,et al.  Dynamic Optimal Unit Commitment and Loading in Hydropower Systems , 2003 .

[16]  Weerakorn Ongsakul,et al.  Improved merit order and augmented Lagrange Hopfield network for short term hydrothermal scheduling , 2009 .

[17]  Chuntian Cheng,et al.  Operation challenges for fast-growing China's hydropower systems and respondence to energy saving and emission reduction , 2012 .

[18]  Yong Cheol Kang,et al.  Unit Commitment Considering Interruptible Load for Power System Operation with Wind Power , 2014 .

[19]  Huifeng Zhang,et al.  Culture belief based multi-objective hybrid differential evolutionary algorithm in short term hydrothermal scheduling , 2013 .

[20]  Yu Li,et al.  Joint Operation of the Multi-Reservoir System of the Three Gorges and the Qingjiang Cascade Reservoirs , 2011 .

[21]  K. Shanti Swarup,et al.  Hybrid DE–SQP algorithm for non-convex short term hydrothermal scheduling problem , 2011 .

[22]  Erlon Cristian Finardi,et al.  Solving the hydrothermal scheduling problem considering network constraints , 2012 .

[23]  Sen Wang,et al.  Parallel discrete differential dynamic programming for multireservoir operation , 2014, Environ. Model. Softw..

[24]  Chuntian Cheng,et al.  Short-Term Hydroscheduling with Discrepant Objectives Using Multi-Step Progressive Optimality Algorithm1 , 2012 .

[25]  S. Al-Agtash,et al.  Hydrothermal Scheduling by Augmented Lagrangian: Consideration of Transmission Constraints and Pumped-Storage Units , 2001, IEEE Power Engineering Review.

[26]  John W. Labadie,et al.  Optimal Operation of Multireservoir Systems: State-of-the-Art Review , 2004 .

[27]  R. Adapa,et al.  A review of selected optimal power flow literature to 1993. II. Newton, linear programming and interior point methods , 1999 .

[28]  Yi Hu,et al.  Ultra High Voltage Transmission in China: Developments, Current Status and Future Prospects , 2009, Proceedings of the IEEE.

[29]  Weerakorn Ongsakul,et al.  Hybrid Enhanced Lagrangian Relaxation and Quadratic Programming for Hydrothermal Scheduling , 2007 .