Hybrid flow shop scheduling: a survey
暂无分享,去创建一个
[1] Robert J. Wittrock,et al. Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..
[2] Marius M. Solomon,et al. A computational study of heuristics for two-stage flexible flowshops , 1996 .
[3] Michael Pinedo,et al. BPSS: A Scheduling Support System for the Packaging Industry , 1993, Oper. Res..
[4] Chelliah Sriskandarajah,et al. Scheduling algorithms for flexible flowshops: Worst and average case performance , 1988 .
[5] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[6] Antony Vignier,et al. A branch and bound approach to minimize the total completion time in a k-stage hybrid flowshop , 1996, Proceedings 1996 IEEE Conference on Emerging Technologies and Factory Automation. ETFA '96.
[7] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[8] Bertrand M. T. Lin,et al. Two-stage flowshop scheduling with a common second-stage machine , 1997, Comput. Oper. Res..
[9] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[10] Jatinder N. D. Gupta,et al. Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .
[11] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[12] Robert J. T. Morris,et al. Heuristic methods for flexible flow line scheduling , 1987 .
[13] Dileep R. Sule,et al. Sequencing n jobs on two machines with setup, processing and removal times separated , 1982 .
[14] Bo Chen. Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage , 1995 .
[15] R. J. Paul. A Production Scheduling Problem in the Glass-Container Industry , 1979, Oper. Res..
[16] Chandrasekharan Rajendran,et al. Scheduling in n-job, m-stage flowshop with parallel processors to minimize makespan , 1992 .
[17] S. E. Elmaghraby,et al. The Planning and Scheduling of Production Systems , 1996 .
[18] J. Gupta,et al. Scheduling a two-stage hybrid flowshop with separable setup and removal times , 1994 .
[19] D. Chaudhuri,et al. A multi-stage parallel-processor flowshop problem with minimum flowtime , 1992 .
[20] Seetuarma L. Narastmhan,et al. Scheduling in a two-stage manufacturing process , 1984 .
[21] J. Gupta,et al. Schedules for a two-stage hybrid flowshop with parallel machines at the second stage , 1991 .
[22] C. Proust,et al. New lower bound for the hybrid flowshop scheduling problem , 1997, 1997 IEEE 6th International Conference on Emerging Technologies and Factory Automation Proceedings, EFTA '97.
[23] Steven A. Melnyk,et al. Shop Floor Control , 1985 .
[24] Robert J. Wittrock,et al. An Adaptable Scheduling Algorithm for Flexible Flow Lines , 1988, Oper. Res..
[25] J. Gupta,et al. A flow‐shop problem with sequence‐dependent additive setup times , 1987 .
[26] Huang Dao,et al. Optimization production scheduling of multi-stage interrelated discrete system via synthetic knowledge , 1994, Proceedings of 1994 American Control Conference - ACC '94.
[27] J. Hunsucker,et al. BRANCH AND BOUND ALGORITHM FOR THE FLOW SHOP WITH MULTIPLE PROCESSORS , 1991 .
[28] Chris N. Potts,et al. Scheduling a two-stage hybrid flow shop with parallel machines at the first stage , 1997, Ann. Oper. Res..
[29] Seetharama L. Narasimhan,et al. A COMPARISON OF SEQUENCING RULES FOR A TWO‐STATE HYBRID FLOW SHOP , 1987 .
[30] Jan Karel Lenstra,et al. PREEMPTIVE SCHEDULING IN A TWO-STAGE MULTIPROCESSOR FLOW SHOP IS NP-HARD , 1996 .
[31] S. S. Panwalkar,et al. The Lessons of Flowshop Scheduling Research , 1992, Oper. Res..
[32] J.-C. Billaut,et al. Resolution of some 2-stage hybrid flowshop scheduling problems , 1996, 1996 IEEE International Conference on Systems, Man and Cybernetics. Information Intelligence and Systems (Cat. No.96CH35929).
[33] S. E. Elmaghraby,et al. Production control in hybrid flowshops: an example from textile manufacturing , 1997 .