General Behavior of Braced Excavation in Bukit Timah Granite Residual Soils: a Case Study
暂无分享,去创建一个
The excavation system performance and ground movement behavior for the cut-and-cover excavation for the Downtown Line 2 Cashew Station in Singapore is presented. The information presented includes ground settlement profiles, wall deflection profiles, strut loads, and ground water monitoring behavior. Construction activities and remedial measures that were undertaken are also presented. Comparisons of the measured wall deflections and the ground surface settlements are also performed against the empirical methods/charts from the literature. It is hoped that this case study will provide useful reference and insights for future projects involving excavation in the Bukit Timah Granite residual soils.
[1] Chang-Yu Ou,et al. Characteristics of ground surface settlement during excavation , 1993 .
[2] G. Wayne Clough,et al. Construction Induced Movements of Insitu Walls , 1990 .
[3] Chang-Yu Ou,et al. Shape of ground surface settlement profiles caused by excavation , 1998 .