Application of value stream mapping for lean operations and cycle time reduction: an Indian case study

For the last few years almost every manufacturing industry has been trying to get ‘lean’. A headlong rush to offer value to the customers by becoming lean and responsive has created an urgency for researchers and practitioners to apply new tools and techniques to address various wastes. The process of mapping the material and information flows of all components and sub-assemblies in a value stream that includes manufacturing, suppliers and distribution to the customer is known as value stream mapping (VSM). VSM has proved effective in identifying and eliminating wastes in a facility with similar or identical product routings, such as in assembly facilities. In this paper, an attempt has been made to use VSM as a technique to achieve productivity improvement at supplier end for an auto industry. Both current and future (‘as is’ and ‘to be’) states of supplier shopfloor scenarios are discussed using value stream concepts. This is analysed along with takt time calculations and the application of other gap areas. Finally, gain in production output per person, reduction of work in process and finished goods inventory affecting productivity are also reported.

[1]  C. Harland Supply Chain Management: Relationships, Chains and Networks , 1996 .

[2]  John B. Kidd,et al.  Toyota Production System , 1993 .

[3]  Nick Rich,et al.  The seven value stream mapping tools , 1997 .

[4]  D. Towill Time compression and supply chain management ‐ a guided tour , 1996 .

[5]  C. New Production Funnels: A New Tool for Operations Analysis , 1974 .

[6]  Stephen Michael Disney,et al.  The uncertainty circle as a value stream audit tool: A case study to identify the BPR requirements of the European automotive sector , 2000 .

[7]  D. Macbeth,et al.  Partnership sourcing: an Integrated supply chain approach , 1994 .

[8]  D. Towill,et al.  Analysis of the factors affecting real-world value stream performance , 2002 .

[9]  Daniel T. Jones,et al.  From lean production to the lean enterprise , 1994 .

[10]  R. Barker The Design of Lean Manufacturing Systems Using Time‐based Analysis , 1994 .

[11]  D. Towill FORRIDGE - Principles of good practice in material flow , 1997 .

[12]  Daniel T. Jones,et al.  Seeing the Whole Mapping the Extended Value Stream , 2002 .

[13]  John K. Gershenson,et al.  Classification scheme for lean manufacturing tools , 2003 .

[14]  新郷 重夫,et al.  A study of the Toyota production system from an industrial engineering viewpoint , 1989 .

[15]  David Taylor,et al.  Manufacturing Operations and Supply Chain Management: The LEAN Approach , 2000 .

[16]  C. New The Use of Throughput Efficiency as a Key Performance Measure for the New Manufacturing Era , 1993 .

[17]  William Feld,et al.  Lean Manufacturing: Tools, Techniques, and How to Use Them , 2000 .

[18]  Computer Staff,et al.  The Machine That Changed the World , 1992 .

[19]  T. Hout,et al.  Competing Against Time , 1990 .

[20]  George Jr. Stalk Hout Competing Against Time : How Time Based Competition Is Reshaping Global Markets , 2002 .

[21]  R. Schonberger Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .

[22]  Graham K. Rand Beyond Partnership: Strategies for Innovation and Lean Supply , 1993 .

[23]  Thomas Johnsen,et al.  An initial classification of supply networks , 2000 .

[24]  Mari Sako,et al.  Price, Quality and Trust: Inter-firm Relations in Britain and Japan , 1992 .

[25]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[26]  John R. Shook,et al.  Learning to See: Value Stream Mapping to Create Value and , 1998 .

[27]  新郷 重夫 The sayings of Shigeo Shingo : key strategies for plant improvement , 1987 .

[28]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .