An EPQ Model for Deteriorating Production System and Items with Rework
暂无分享,去创建一个
[1] C M Hinckley,et al. Defining the best quality-control systems by design and inspection. , 1997, Clinical chemistry.
[2] Angappa Gunasekaran,et al. An integrated production-inventory-marketing model for deteriorating items , 1995 .
[3] S. K. Goyal,et al. Recent trends in modeling of deteriorating inventory , 2001, Eur. J. Oper. Res..
[4] Ruud H. Teunter,et al. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives , 2003, OR Spectr..
[5] Izak Duenyas,et al. Integrated maintenance and production control of a deteriorating production system , 2002 .
[6] Allen H. Tai. Economic production quantity models for deteriorating/imperfect products and service with rework , 2013, Comput. Ind. Eng..
[7] Prakash L. Abad,et al. Optimal pricing and lot-sizing under conditions of perishability, finite production and partial backordering and lost sale , 2003, Eur. J. Oper. Res..
[8] Karl Inderfurth,et al. Lotsizing in a Production System with Rework and Product Deterioration , 2005, OR.
[9] Hui-Ming Wee,et al. Economic production lot size for deteriorating items taking account of the time-value of money , 1999, Comput. Oper. Res..
[10] Leopoldo Eduardo Cárdenas-Barrón,et al. Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..
[11] G. Ozdemir,et al. An economic order quantity model with defective items and shortages , 2007 .
[12] Shib Sankar Sana,et al. A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .
[13] Biswajit Sarkar,et al. A production-inventory model with probabilistic deterioration in two-echelon supply chain management , 2013 .
[14] Y. Chiu. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .
[15] B. Sarkar,et al. An economic production quantity model with random defective rate, rework process and backorders for a single stage production system , 2014 .
[16] Singa Wang Chiu,et al. Combining an alternative multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..
[17] Leopoldo Eduardo Cárdenas-Barrón,et al. An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments , 2013 .
[18] Hong-Dar Lin,et al. Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework , 2011 .
[19] Hui-Ming Wee,et al. Economic production lot size model for deteriorating items with partial back-ordering , 1993 .
[20] David W. Pentico,et al. The deterministic EPQ with partial backordering: A new approach , 2009 .
[21] Leopoldo Eduardo Cárdenas-Barrón,et al. The economic production quantity (EPQ) with shortage derived algebraically , 2001 .
[22] K. S. Chaudhuri,et al. Production, Manufacturing and Logistics An EOQ model with ramp type demand rate, time dependent deterioration rate, unit production cost and shortages , 2006 .
[23] Gary C. Lin,et al. Economic lot sizing for an imperfect production system subject to random breakdowns , 2006 .
[24] Fred Raafat,et al. Survey of Literature on Continuously Deteriorating Inventory Models , 1991 .
[25] Yuan-Shyi Peter Chiu,et al. Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note , 2014 .
[26] Abraham Mehrez,et al. Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality , 1994 .
[27] C. H. Kim,et al. An optimal production run length in deteriorating production processes , 1999 .