This paper investigates the difference between the optimal fuel mix incorporating a pre-installed generation capacity constraint and the actual fuel mix in the Korean power market. Since the restructuring of the market, the fuel mix has been determined partly by investors and partly by the Basic Plan for Long-Term Electricity Supply and Demand (BPE). Both the system marginal price (SMP), and the capacity payment (CP), which has been based on the fixed cost of a specific gas turbine generator, were intended to provide an investment incentive in the market; however, they did not bring about an optimal fuel mix in Korea. Under the circumstances of a shortage of base load generators, these generators may garner excessive profits due to a high SMP level. However, the adjustment scheme of profit between KEPCO and Gencos left scant profit for generators. This paper suggests that a contract is needed to create the appropriate profit and tax levels for these base load generators. The redistribution of profit improves equality between consumers and generators, and the proper margin creates incentives for base load technology investment in Korea.
[1]
In-Koo Cho,et al.
Market power and network constraint in a deregulated electricity market
,
2007
.
[2]
Paul L. Joskow,et al.
Capacity payments in imperfect electricity markets: Need and design
,
2008
.
[3]
Dieter Helm.
The new energy paradigm
,
2007
.
[4]
Peter Cramton.
Competitive bidding behavior in uniform-price auction markets
,
2004
.
[5]
In-Koo Cho,et al.
Competitive Equilibrium in a Radial Network
,
2003
.
[6]
Serkan Bahçeci,et al.
A COMPARATIVE ANALYSIS OF ACTUAL LOCATIONAL MARGINAL PRICES IN THE PJM MARKET AND ESTIMATED SHORT -RUN MARGINAL COSTS : 2003-2006
,
2007
.
[7]
P. Joskow.
Competitive Electricity Markets and Investment in New Generating Capacity
,
2006
.