Evaluating Lot‐sizing Performance in Multi‐level MRP Systems: A Comparative Analysis of Multiple Performance Measures

Past research in examining the performance of alternative lot‐sizing rules has focused on the total cost of inventory carrying cost and set‐up cost. Although this cost‐related performance measure is significant for evaluating the overall efficiency of production systems, there are other variations such as frequent rescheduling, generally referred to as system nervousness, occurring that would affect the production scheduling and subsequently the system performance. Expands the performance criteria to re‐evaluate the effectiveness of using several commonly tested lot‐sizing rules in a multi‐level MRP system under stochastic operating environments by means of a simulation study. Results indicate that the Silver‐Meal algorithm seem to perform very well under most operating environments tested. Also, the operating environments play a significant role in the relative performance of lot‐sizing rules tested.

[1]  V. Sridharan,et al.  Master production scheduling make-to-stock products: a framework for analysis , 1990 .

[2]  Thomas G. Schmitt Resolving uncertainty in manufacturing systems , 1984 .

[3]  Mark A. McKnew,et al.  An Improved Heuristic for Multilevel Lot Sizing in Material Requirements Planning , 1991 .

[4]  Emre A. Veral,et al.  THE PERFORMANCE OF A SIMPLE INCREMENTAL LOT‐SIZING RULE IN A MULTILEVEL INVENTORY ENVIRONMENT , 1985 .

[5]  Dean H. Kropp,et al.  HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS , 1983 .

[6]  D. Clay Whybark,et al.  THE COEFFICIENT OF VARIATION AS A FACTOR IN MRP RESEARCH , 1985 .

[7]  Joseph R. Biggs HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .

[8]  Joseph D. Blackburn,et al.  Improved heuristics for multistage requirements planning systems , 1982 .

[9]  H Mather,et al.  Reschedule the reschedules you just rescheduled - Way of life for MRP? , 1977 .

[10]  Steven A. Melnyk,et al.  Leadtime errors in MRP: the lot-sizing effect , 1985 .

[11]  David A. Collier,et al.  Research issues for multi-level lot sizing in MRP systems , 1982 .

[12]  William L. Berry,et al.  Open Order Due Date Maintenance in MRP Systems , 1989 .

[13]  U. Wemmerlöv,et al.  A comparison of discrete, single stage lot-sizing heuristics with special emphasis on rules based on the marginal cost principle , 1982 .

[14]  R. C. Carlson,et al.  Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .

[15]  Urban Wemmerlöv,et al.  Lot-sizing under uncertainty in a rolling schedule environment , 1984 .

[16]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[17]  Urban Wemmerlöv,et al.  The behavior of lot-sizing procedures in the presence of forecast errors , 1989 .

[18]  Bezalel Gavish,et al.  Optimal Lot-Sizing Algorithms for Complex Product Structures , 1986, Oper. Res..