Prediction of tender price index directional changes

A multivariate discriminant analysis is described, aimed at predicting the direction of changes in the Hong Kong tender price index by utilizing the patterns of change in eight leading economic indicators. Two discriminant functions are derived which distinguish between ‘upward’, ‘constant’ and ‘downward’ index trends with a high degree of success. The predictive power of the discriminant model is tested by means of a simulated ex post holdout sample of eight index values. By comparing the group centroids, seven of the cases are correctly classified. The hit rate of the ‘upward’ and ‘constant’ groups is 100%, while the ‘downward’ group has a hit rate of 75%, suggesting the ‘downward’ trend to be a more difficult movement to predict. Despite this, the overall predictive results are considerably better than those that would have occurred by chance alone.

[1]  T. Cacoullos,et al.  Discriminant analysis and applications , 1974 .

[2]  K. W. Chau,et al.  The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong , 1998 .

[3]  K. Runeson,et al.  Methodology and method for price-level forecasting in the building industry , 1988 .

[4]  A. Akintoye,et al.  The accuracy and optimal linear correction of UK construction tender price index forecasts , 1995 .

[5]  R. M. Skitmore,et al.  A comparative analysis of three macro price forecasting models , 1994 .

[6]  S. A. Akintoye Construction tender price index: Modelling and forecasting trends , 1991 .

[7]  Thomas M. O'Donovan,et al.  Short term forecasting: An introduction to the Box-Jenkins approach , 1983 .

[8]  Craig B. Borkowf,et al.  Time-Series Forecasting , 2002, Technometrics.

[9]  Martin Skitmore,et al.  The influence of professional expertise in construction price forecasts , 1985 .

[10]  Adrian J. Smith Estimating, Tendering and Bidding for Construction , 1995 .

[11]  Anthony Walker,et al.  The Construction Industry in Hong Kong , 1995 .

[12]  M. Skitmore,et al.  Analysis of UK tender price levels , 1990 .

[13]  C. Heckler Applied Discriminant Analysis , 1995 .

[14]  Akintola Akintoye,et al.  Macro-economic leading indicators of construction contract prices , 1998 .

[15]  T. Hall,et al.  Forecasting economic turning points with neural nets , 1991, IJCNN-91-Seattle International Joint Conference on Neural Networks.

[16]  Akintola Akintoye,et al.  Macro models of UK construction contract prices , 1993 .

[17]  Chris Chatfield,et al.  Time‐series forecasting , 2000 .

[18]  R. Fellows Escalation management: Forecasting the effects of inflation on building projects , 1991 .

[19]  J. Bikker,et al.  International interdependence of business cycles in the manufacturing industry: The use of leading indicators for forecasting and analysis , 1995 .

[20]  Michael C Fleming,et al.  Spon's Construction Cost and Price Indices Handbook , 1990 .

[21]  Paul Bowen,et al.  Building price-level forecasting: an examination of techniques and applications , 1987 .

[22]  Rolph E. Anderson,et al.  Multivariate data analysis (4th ed.): with readings , 1995 .