Freezing the Master Production Schedule Under Rolling Planning Horizons

The stability of the Master Production Schedule MPS is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning horizon length. Simulation experiment results are reported which suggest that freezing up to 50% of the planning horizon has a marginal effect on production and inventory cost under a wide range of operating conditions. These results also suggest that an order based freezing method produces superior results in comparison with a period based method.

[1]  K. R. Baker,et al.  An Analytic Framework for Evaluating Rolling Schedules , 1979 .

[2]  Joseph D. Blackburn,et al.  HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* , 1980 .

[3]  Dean H. Kropp,et al.  THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING , 1982 .

[4]  Dean H. Kropp,et al.  MRP system nervousness: Causes and cures , 1985 .

[5]  L. V. Wassenhove,et al.  COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING , 1983 .

[6]  Joseph D. Blackburn,et al.  The impact of a rolling schedule in a multi-level MRP system , 1982 .

[7]  Dean H. Kropp,et al.  HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS , 1983 .

[8]  H. L. Ong,et al.  Expected Performance of Some Lot-Sizing Heuristics in a Rolling-Schedule Environment , 1984 .

[9]  William L. Berry,et al.  MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .

[10]  Chen-Hua Chung,et al.  Planning horizons for master production scheduling , 1984 .

[11]  Suresh Chand,et al.  A NOTE ON DYNAMIC LOT SIZING IN A ROLLING-HORIZON ENVIRONMENT , 1982 .

[12]  R. C. Carlson,et al.  Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .

[13]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[14]  J.Roberta Minifie,et al.  On the generalizability of MRP simulation results , 1985 .

[15]  Jeffrey Miller Hedging the master schedule , 1979 .

[16]  Leroy B. Schwarz Technical Note - A Note on the Near Optimality of "5-EOQ's Worth" Forecast Horizons , 1977, Oper. Res..

[17]  Rolf A. Lundin,et al.  Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results , 1975, Oper. Res..

[18]  Kenneth R. Baker,et al.  AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING , 1977 .