Results from in-situ monitoring of displacement, bolt load, and disturbed zone of a powerhouse cavern during excavation process
暂无分享,去创建一个
Yingxi Liu | He Yu | Shouju Li | Shouju Li | Yingxi Liu | He Yu | Fengji Wu | Feng-yi Wu
[1] R. Bernard,et al. Geo-monitoring performed during the construction of the Valik highway tunnels , 2006 .
[2] R. Azzam,et al. The Plastic Zones and Displacements Around Underground Openings in Rock Masses Containing a Fault , 2005 .
[3] Tetsuro Esaki,et al. A rock bolt and rock mass interaction model , 2004 .
[4] P. R. Sheorey,et al. Bolt length requirement in underground openings , 2007 .
[5] Erik Eberhardt,et al. Numerical modelling of three-dimension stress rotation ahead of an advancing tunnel face , 2001 .
[6] Márcio Muniz de Farias,et al. Displacement control in tunnels excavated by the NATM: 3-D numerical simulations , 2004 .
[7] R. J. Fowell,et al. EFFECTS OF DIFFERENT TUNNEL FACE ADVANCE EXCAVATION ON THE SETTLEMENT BY FEM , 2003 .
[8] Yoshiaki Okui,et al. Numerical simulation of the excavation damaged zone around an opening in brittle rock , 2007 .
[9] Masanobu Tezuka,et al. Latest technology of underground rock cavern excavation in Japan , 2003 .