Risk analysis for oil & gas pipelines: A sustainability assessment approach using fuzzy based bow-tie analysis

Abstract Vast amounts of oil & gas (O&G) are consumed around the world everyday that are mainly transported and distributed through pipelines. Only in Canada, the total length of O&G pipelines is approximately 100,000 km, which is the third largest in the world. Integrity of these pipelines is of primary interest to O&G companies, consultants, governmental agencies, consumers and other stakeholder due to adverse consequences and heavy financial losses in case of system failure. Fault tree analysis (FTA) and event tree analysis (ETA) are two graphical techniques used to perform risk analysis, where FTA represents causes (likelihood) and ETA represents consequences of a failure event. ‘Bow-tie’ is an approach that integrates a fault tree (on the left side) and an event tree (on the right side) to represent causes, threat (hazards) and consequences in a common platform. Traditional ‘bow-tie’ approach is not able to characterize model uncertainty that arises due to assumption of independence among different risk events. In this paper, in order to deal with vagueness of the data, the fuzzy logic is employed to derive fuzzy probabilities ( likelihood ) of basic events in fault tree and to estimate fuzzy probabilities ( likelihood ) of output event consequences. The study also explores how interdependencies among various factors might influence analysis results and introduces fuzzy utility value (FUV) to perform risk assessment for natural gas pipelines using triple bottom line (TBL) sustainability criteria, namely, social, environmental and economical consequences. The present study aims to help owners of transmission and distribution pipeline companies in risk management and decision-making to consider multi-dimensional consequences that may arise from pipeline failures. The research results can help professionals to decide whether and where to take preventive or corrective actions and help informed decision-making in the risk management process. A simple example is used to demonstrate the proposed approach.

[1]  Nijs Jan Duijm,et al.  Safety-barrier diagrams as a safety management tool , 2009, Reliab. Eng. Syst. Saf..

[2]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[3]  Brian Veitch,et al.  Fault and Event Tree Analyses for Process Systems Risk Analysis: Uncertainty Handling Formulations , 2011, Risk analysis : an official publication of the Society for Risk Analysis.

[4]  M. Bilo,et al.  Thermal radiation criteria used in pipeline risk assessment , 1997 .

[5]  Ccps Guidelines for Chemical Process Quantitative Risk Analysis , 1999 .

[6]  Adedeji B. Badiru,et al.  Fuzzy modeling and analytic hierarchy processing to quantify risk levels associated with occupational injuries. I. The development of fuzzy-linguistic risk levels , 1996, IEEE Trans. Fuzzy Syst..

[7]  Toly Chen,et al.  A fuzzy set approach for event tree analysis , 2001, Fuzzy Sets Syst..

[8]  Stefan Scheer,et al.  Sensitivity analysis for system design improvement , 2000, Proceeding International Conference on Dependable Systems and Networks. DSN 2000.

[9]  F R Chevreau,et al.  Organizing learning processes on risks by using the bow-tie representation. , 2006, Journal of hazardous materials.

[10]  Brian Veitch,et al.  RISK-BASED DECISION-MAKING FOR DRILLING WASTE DISCHARGES USING A FUZZY SYNTHETIC EVALUATION TECHNIQUE , 2004 .

[11]  Huey-Ming Lee,et al.  Applying fuzzy set theory to evaluate the rate of aggregative risk in software development , 1996, Fuzzy Sets Syst..

[12]  George J. Klir,et al.  Uncertainty Modeling and Analysis in Engineering and the Sciences (Hardcover) , 2006 .

[13]  R.C. Wilcox,et al.  Uncertainty modeling of data and uncertainty propagation for risk studies , 2003, Fourth International Symposium on Uncertainty Modeling and Analysis, 2003. ISUMA 2003..

[14]  George J. Klir,et al.  Fuzzy sets and fuzzy logic - theory and applications , 1995 .

[15]  Adiel Teixeira de Almeida,et al.  A multicriteria model for risk sorting of natural gas pipelines based on ELECTRE TRI integrating Utility Theory , 2010, Eur. J. Oper. Res..

[16]  Rae Zimmerman,et al.  Risk management of cost consequences in natural gas transmission and distribution infrastructures , 2010 .

[17]  Enrico Cagno,et al.  Using AHP in determining the prior distributions on gas pipeline failures in a robust Bayesian approach , 2000, Reliab. Eng. Syst. Saf..

[18]  Rehan Sadiq,et al.  Drilling waste discharges in the marine environment : a risk based decision methodology , 2001 .

[19]  S. Kaplan,et al.  On The Quantitative Definition of Risk , 1981 .

[20]  Cécile Fiévez,et al.  ARAMIS project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance. , 2006, Journal of hazardous materials.

[21]  Adam S. Markowski,et al.  Fuzzy logic for process safety analysis , 2009 .

[22]  Bilal M. Ayyub,et al.  Systems framework for fuzzy sets in civil engineering , 1991 .

[23]  V. Venkat Raj,et al.  Uncertainty in fault tree analysis: A fuzzy approach , 1996, Fuzzy Sets Syst..

[24]  Rehan Sadiq,et al.  Risk-Based Prioritization of Air Pollution Monitoring Using Fuzzy Synthetic Evaluation Technique , 2005, Environmental monitoring and assessment.

[25]  Tahir Husain,et al.  Fuzzy risk-based decision-making approach for selection of drinking water disinfectants , 2007 .

[26]  Y.-D. Jo,et al.  Analysis of hazard areas associated with high-pressure natural-gas pipelines , 2002 .

[27]  Ramana V. Grandhi,et al.  An approximation approach for uncertainty quantification using evidence theory , 2004, Reliab. Eng. Syst. Saf..

[28]  Josep Arnaldos,et al.  Design of a computer tool for the evaluation of the consequences of accidental natural gas releases in distribution pipes , 1998 .

[29]  Spyros Sklavounos,et al.  Estimation of safety distances in the vicinity of fuel gas pipelines , 2006 .

[30]  Faisal Khan,et al.  Risk analysis of a typical chemical industry using ORA procedure , 2001 .

[31]  R. Sadiq,et al.  Aggregative risk analysis for water quality failure in distribution networks , 2004 .

[32]  Scott Ferson,et al.  Dependence in Dempster-Shafer theory and probability bounds analysis* , 2004 .

[33]  Dong Yuhua,et al.  Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis , 2005 .

[34]  Kari Sentz,et al.  Combination of Evidence in Dempster-Shafer Theory , 2002 .

[35]  R. Kenarangui Event-tree analysis by fuzzy probability , 1991 .

[36]  J. E. Cockshott Probability Bow-Ties: A Transparent Risk Management Tool , 2005 .

[37]  Alex W. Dawotola,et al.  Risk Assessment of Petroleum Pipelines using a com- bined Analytical Hierarchy Process - Fault Tree Analysis (AHP-FTA) , 2009 .

[38]  Solomon Tesfamariam,et al.  Risk-Based Seismic Evaluation of Reinforced Concrete Buildings , 2008 .

[39]  Adiel Teixeira de Almeida,et al.  Multi-attribute risk assessment for risk ranking of natural gas pipelines , 2009, Reliab. Eng. Syst. Saf..

[40]  Singiresu S Rao,et al.  Fault tree analysis of fuzzy mechanical systems , 1994 .

[41]  Brian Veitch,et al.  Handling data uncertainties in event tree analysis , 2009 .

[42]  G A Papadakis Assessment of requirements on safety management systems in EU regulations for the control of major hazard pipelines. , 2000, Journal of hazardous materials.

[43]  E. H. Mamdani,et al.  Application of Fuzzy Logic to Approximate Reasoning Using Linguistic Synthesis , 1976, IEEE Transactions on Computers.

[44]  H Christopher Frey,et al.  OF SENSITIVITY ANALYSIS , 2001 .

[45]  M. J. Frank On the simultaneous associativity ofF(x, y) andx+y−F(x, y) , 1978 .

[46]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[47]  Adam S. Markowski,et al.  Aspects of risk analysis associated with major failures of fuel pipelines , 2006 .

[48]  Rehan Sadiq,et al.  Predicting risk of water quality failures in distribution networks under uncertainties using fault-tree analysis , 2008 .

[49]  John E. Renaud,et al.  Uncertainty quantification using evidence theory in multidisciplinary design optimization , 2004, Reliab. Eng. Syst. Saf..

[50]  M. J. Frank On the simultaneous associativity ofF(x,y) andx +y -F(x,y) , 1979 .