Scheduling Computational and Transmission Tasks in Computational Grids
暂无分享,去创建一个
[1] Grzegorz Waligóra,et al. Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times , 2008, Eur. J. Oper. Res..
[2] Grzegorz Waligóra,et al. Modelling and solving grid resource allocation problem with network resources for workflow applications , 2011, J. Sched..
[3] Grzegorz Waligóra,et al. Modelling Setup Times in Project Scheduling , 2006 .
[4] Grzegorz Waligóra,et al. A metaheuristic approach to scheduling workflow jobs on a Grid , 2004 .
[5] Jan Weglarz,et al. Hierarchical scheduling strategies for parallel tasks and advance reservations in grids , 2013, J. Sched..
[6] Jarek Nabrzyski,et al. Multicriteria aspects of Grid resource management , 2004 .
[7] Adam Arbree,et al. Mapping Abstract Complex Workflows onto Grid Environments , 2003, Journal of Grid Computing.
[8] Grzegorz Waligóra,et al. Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling , 2001, Ann. Oper. Res..
[9] Ian Foster,et al. The Grid 2 - Blueprint for a New Computing Infrastructure, Second Edition , 1998, The Grid 2, 2nd Edition.
[10] Jarek Nabrzyski,et al. Grid resource management: state of the art and future trends , 2004 .
[11] Jarek Nabrzyski,et al. A multicriteria approach to two-level hierarchy scheduling in grids , 2008, J. Sched..
[12] Jan Weglarz,et al. Multicriteria, multi-user scheduling in grids with advance reservation , 2010, J. Sched..
[13] Joanna Józefowska,et al. Perspectives in modern project scheduling , 2006 .
[14] Jarek Nabrzyski,et al. Grid Multicriteria Job Scheduling with Resource Reservation and Prediction Mechanisms , 2006 .