Improved AHP Method and Its Application in Risk Identification
暂无分享,去创建一个
Mingju Zhang | Xiuli Du | Fengwei Li | Kok Kwang Phoon | K. Phoon | Xiu-li Du | Fengwei Li | Ming-ju Zhang
[1] Aviad Shapira,et al. Systematic Evaluation of Construction Equipment Alternatives: Case Study , 2007 .
[3] H. Ishii,et al. Fuzzy AHP with incomplete information , 2001, Proceedings Joint 9th IFSA World Congress and 20th NAFIPS International Conference (Cat. No. 01TH8569).
[4] Thomas L. Saaty,et al. Conflict resolution : the analytic hierarchy approach , 1989 .
[5] Florence Yean Yng Ling,et al. Developing a model to measure the effectiveness of safety management systems of construction sites , 2006 .
[6] Daniel W. Halpin,et al. Assessment of Life-Cycle Benefit-Cost of Composites in Construction , 2000 .
[7] C. Kahraman,et al. Multi‐criteria supplier selection using fuzzy AHP , 2003 .
[8] Aviad Shapira,et al. AHP-Based Weighting of Factors Affecting Safety on Construction Sites with Tower Cranes , 2009 .
[9] Z. Xu,et al. On consistency of the weighted geometric mean complex judgement matrix in AHP , 2000, Eur. J. Oper. Res..
[10] Bodo Glaser. Fundamentals of Decision Making , 2002 .
[11] Thomas L. Saaty,et al. Decision making for leaders , 1985, IEEE Transactions on Systems, Man, and Cybernetics.
[12] Miroslaw J. Skibniewski. Framework for decision-making on implementing robotics in construction , 1988 .
[13] Hideyuki Imai,et al. A Fuzzy Representation for Weights of Alternatives in AHP , 2007, EUSFLAT Conf..
[14] Ching-Lai Hwang,et al. Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.
[15] T. L. Saaty. A Scaling Method for Priorities in Hierarchical Structures , 1977 .
[16] L. C. Leung,et al. On consistency and ranking of alternatives in fuzzy AHP , 2000, Eur. J. Oper. Res..
[17] Jiaqin Yang,et al. AN AHP DECISION MODEL FOR FACILITY LOCATION SELECTION , 1997 .
[18] Miroslaw J. Skibniewski,et al. Evaluation of Advanced Construction Technology with AHP Method , 1992 .
[19] Evangelos Triantaphyllou,et al. An evaluation of the eigenvalue approach for determining the membership values in fuzzy sets , 1990 .
[20] Wang Chun-sheng,et al. Evaluation on Expressway Construction Project Management Effectiveness Based on G-AHP Model: Cases in Guangdong Province of China , 2006 .
[21] Thomas L. Saaty,et al. Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .
[22] Min-Yuan Cheng,et al. SIMULATION-ENHANCED APPROACH FOR RANKING MAJOR TRANSPORT PROJECTS , 2006 .
[23] Vincent G. Duffy,et al. Using AHP for determining priority in a safety management system , 2004, Ind. Manag. Data Syst..
[24] Aviad Shapira,et al. AHP-Based Equipment Selection Model for Construction Projects , 2005 .
[25] Sai On Cheung,et al. An analytical hierarchy process based procurement selection method , 2001 .
[26] Po-Cheng Chou,et al. Adapting aspects of GBTool 2005—searching for suitability in Taiwan , 2007 .
[27] Patrick S. W. Fong,et al. Final contractor selection using the analytical hierarchy process , 2000 .
[28] George Lakoff,et al. Hedges: A study in meaning criteria and the logic of fuzzy concepts , 1973, J. Philos. Log..
[29] José María Moreno-Jiménez,et al. The geometric consistency index: Approximated thresholds , 2003, Eur. J. Oper. Res..
[30] Yueh-Hsiang Chen,et al. Applying fuzzy linguistic preference relations to the improvement of consistency of fuzzy AHP , 2008, Inf. Sci..
[31] Fatemeh Zahedi,et al. The Analytic Hierarchy Process—A Survey of the Method and its Applications , 1986 .
[32] Matthias Klumpp,et al. Analytical Hierarchy Process in Supplier Evaluation , 2010 .
[33] J. Dolan. Shared decision-making--transferring research into practice: the Analytic Hierarchy Process (AHP). , 2008, Patient education and counseling.
[34] Kamal M. Al‐Subhi Al‐Harbi,et al. Application of the AHP in project management , 2001 .
[35] Luiz Moutinho,et al. Analytical hierarchy process , 1994 .
[36] Gwo-Hshiung Tzeng,et al. Fuzzy MCDM approach for planning and design tenders selection in public office buildings , 2004 .
[37] Thomas L. Saaty,et al. The Logic of Priorities , 1982 .
[38] F. A. Lootsma,et al. Multicriteria decision analysis with fuzzy pairwise comparisons , 1989 .
[39] Heng Li,et al. Contractor selection using the analytic network process , 2004 .
[40] Makarand Hastak. Advanced automation or conventional construction process , 1998 .
[41] Thomas L. Saaty,et al. SOME MATHEMATICAL CONCEPTS OF THE ANALYTIC HIERARCHY PROCESS , 1991 .
[42] T. L. Saaty. Exploring the interface between hierarchies, multiple objectives and fuzzy sets , 1978 .
[43] Marcello Braglia,et al. Application of the AHP methodology in making a proposal for a public work contract , 2006 .
[44] Lynn J. Loudenback. Decision making for leaders : Saaty, Thomas L., Lifetime Learning Publications, Belmont, CA, 251 pp. , 1984 .