Relating risk to project performance in Indonesian building contracts

A construction project is unique, specific and dynamic, and therefore projects have different levels and combinations of risks, different responses are taken to minimise those risks and different consequences affect project performance. The primary aim of this study was to analyse the impacts of perceived project risk on project performance. A path model was developed and path analysis was used to determine the relationships between risk and performance. The main survey was predominantly based on a series of interviews with project managers. A total of 22 building projects under construction were surveyed; however, only 13 projects used an ‘S’ curve to monitor their project performance. The study focused on these 13 projects and found that perceived project risk had a direct negative effect on monthly progress achievement, while monthly progress had a direct positive impact on schedule performance. Although project risk had no direct effect on schedule performance, this was influenced indirectly with monthly progress as the mediator between them. These findings indicate that the higher the project risk in a project, the greater the negative impact on monthly progress, and consequently the worse the schedule performance will be.

[1]  T. Mezher,et al.  Causes of delays in the construction industry in Lebanon , 1998 .

[2]  N. Kartam,et al.  Risk and its management in the Kuwaiti construction industry: a contractors’ perspective , 2001 .

[3]  Terry Williams,et al.  The two-dimensionality of project risk , 1996 .

[4]  Roozbeh Kangari Risk Management Perceptions and Trends of U.S. Construction , 1995 .

[5]  Li Bing,et al.  Risk management in international construction joint ventures , 1999 .

[6]  Ching Chun Li Path Analysis: A Primer , 1977 .

[7]  Makarand Hastak,et al.  ICRAM-1: Model for International Construction Risk Assessment , 2000 .

[8]  Augustine Uche Elinwa,et al.  Time-Overrun Factors in Nigerian Construction Industry , 2001 .

[9]  Raymond Nkado Construction time-influencing factors: the contractor's perspective , 1995 .

[10]  Ming-Teh Wang,et al.  Risk Allocation and Risk Handling of Highway Projects in Taiwan , 2003 .

[11]  B. Akinci,et al.  FACTORS AFFECTING CONTRACTORS' RISK OF COST OVERBURDEN , 1998 .

[12]  G. Wu,et al.  Risk Assessment for Construction Joint Ventures in China , 2001 .

[13]  B. Mulholland,et al.  Risk Assessment in Construction Schedules , 1999 .

[14]  J. Oluwoye,et al.  An analysis of contractors' approaches to risk identification in New South Wales, Australia , 1997 .

[15]  Thomas L. Saaty,et al.  Decision Making for Leaders: The Analytical Hierarchy Process for Decisions in a Complex World , 1982 .

[16]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[17]  Duncan Cramer,et al.  Quantitative data analysis for social scientists , 1990 .

[18]  He Zhi,et al.  Risk management for overseas construction projects , 1995 .

[19]  Svetlana. Cicmil,et al.  RAMP: Risk Analysis and Management for Projects , 1999 .

[20]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[21]  Stephen O. Ogunlana,et al.  Assessment of risks in high rise building construction in Jakarta , 2003 .

[22]  Scott Baker,et al.  Risk response techniques employed currently for major projects , 1999 .

[23]  Mohan M. Kumaraswamy,et al.  Determinants of construction duration , 1995 .

[24]  Andrew D.F. Price,et al.  Relationship between value and duration for construction projects , 1991 .

[25]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[26]  Tzvi Raz,et al.  Use and benefits of tools for project risk management , 2001 .

[27]  Tarek Zayed,et al.  Prototype Model for Build-Operate-Transfer Risk Assessment , 2002 .

[28]  M. Kumaraswamy,et al.  Risk management trends in the construction industry: moving towards joint risk management , 2002 .

[29]  Stephen Ward,et al.  Assessing and managing important risks , 1999 .

[30]  Photios G. Ioannou,et al.  Company and Project Evaluation Model for Privately Promoted Infrastructure Projects , 1996 .

[31]  Mohan M. Kumaraswamy,et al.  A study of the factors affecting construction durations in Hong Kong , 1995 .

[32]  C Loehlin John,et al.  Latent variable models: an introduction to factor, path, and structural analysis , 1986 .

[33]  Mohan M. Kumaraswamy,et al.  Contributors to construction delays , 1998 .