Optimization design of water diversion system in Lianhua water power station

The optimization design was done for water intake of water diversion system, diversion tunnel and surge shaft in the design of Lianhua hydropower st a tion. The works quantity was saved, construction progress was quickened, and t he foundation was laid for advancing generation power.