Preliminary Study on Causative Factors Leading to Construction Cost Overrun

Cost is the fundamental component for any construction project. However, cost overrun is observed as one of the most frequently occurring issues in construction projects worldwide and need to be studied more to alleviate this issue in the future. This trend is more severe in developing countries where these overruns sometimes exceeds 100% of the anticipated cost of the project. Like other countries, construction industry in Malaysia is also facing a lot of challenges such as the delay to complete the project in time, the expenditure exceeding the budget, the building defects and over dependent of foreign workers. The ultimate effects of project delay also results in exceeding cost. This leads to serious need of addressing the critical issue of construction cost overrun. To avoid construction cost overrun, very first and most important step is to identify and understand the causes and factors responsible for that. Hence, this paper is aimed to identify various factors responsible for construction cost overrun. Through a comprehensive study of literature review, common factors causing cost overrun resulting in identification of 78 factors were mapped in frequency table. A questionnaire survey and interviews were carried out amongst selected experienced personnel for expert opinion to identify the significant factors causing cost overrun in Malaysia. Five respondents were selected from each of the respondents groups including client, consultant and contractor. The questionnaire responses were analyzed by average index method, which resulted in identification of 59 common factors causing construction cost overrun in Malaysia. Results show that poor design & delays in Design, unrealistic contract duration & requirements imposed, lack of experience, late delivery of materials & equipment, relationship between management & labour, delay preparation & approval of drawings, inadequate planning & scheduling, poor site management & supervision and mistakes during construction were most common and significant factors causing cost overrun in Malaysian construction industry as perceived by experts

[1]  W J Angelo,et al.  MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS , 2002 .

[2]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[3]  J. K. Yates Construction Decision Support System for Delay Analysis , 1993 .

[4]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[5]  John R. Baldwin,et al.  Causes of Delay in the Construction Industry , 1971 .

[6]  Norhisham Abdul Ghani The importance of preliminaries items , 2006 .

[7]  Charles T. Jahren,et al.  Predictors of Cost‐Overrun Rates , 1990 .

[8]  Jyh-Bin YangJ.-B. Yang,et al.  Using structural equation modeling to analyze relationships among key causes of delay in construction , 2008 .

[9]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[10]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[11]  George Ofori,et al.  Construction industry and economic growth in Singapore , 1988 .

[12]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[13]  Sebastian Morris,et al.  Cost and Time Overruns in Public Sector Projects , 2005 .

[14]  Olugbenga Oludolapo,et al.  Mathematical Expressions for Explaining Project Delays in Southwestern Nigeria , 2011 .

[15]  Al Tabtabai,et al.  Causes For Delays In Construction Projects In Kuwait , 2002 .

[16]  Chotchai Charoenngam,et al.  Assessment of cost control systems: a case study of Thai construction organizations , 2001 .

[17]  Ismail Abdul Rahman,et al.  Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant , 2010 .

[18]  Mm Kumaraswamy,et al.  A survey of time-cost relationships in Hong Kong construction projects , 1982 .

[19]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[20]  Mohd Razaki Abdullah,et al.  Potential Effects on Large Mara Construction Projects Due To Construction Delay , 2009 .

[21]  A. Omoregie,et al.  Infrastructure delays and cost escalation: Causes and effects in Nigeria , 2006 .

[22]  A. Thorpe,et al.  Contractor project risks contingency allocation using linguistic approximation , 1993 .

[23]  Parviz F. Rad,et al.  Delays in Construction of Nuclear Power Plants , 1979 .

[24]  Pantaleo Mutajwaa Daniel Rwelamila,et al.  Total systems intervention: an integrated approach to time, cost and quality management , 1995 .

[25]  A. A. Oladapo,et al.  A quantitative assessment of the cost and time impact of variation orders on construction projects , 2007 .

[26]  Young-Dai Lee,et al.  Investigating delay factors in construction industry: A Korean perspective , 2006 .

[27]  Sugiharto Alwi,et al.  Identifying the important causes of delays in bulding construction projects , 2003 .

[28]  Soo-Yong Kim,et al.  Causes of Construction Delays of Apartment Construction Projects: Comparative Analysis between Vietnam and Korea , 2008 .

[29]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[30]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[31]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[32]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[33]  Daniel C. Okpala,et al.  Causes of High Costs of Construction in Nigeria , 1988 .

[34]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[35]  Ernawati,et al.  The significant factors causing delay of building construction projects in Malaysia , 2007 .

[36]  Andrew S. Chang Reasons for cost and schedule increase for engineering design projects , 2002 .

[37]  Mohammed Ali Berawi,et al.  Conceptual delay mitigation model using a project learning approach in practice , 2008 .

[38]  Peter W. G. Morris,et al.  The Anatomy of Major Projects , 1987 .

[39]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[40]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[41]  Bambang Trigunarsyah,et al.  Knowledge-based material cost control for building construction project using expert system approach , 2008 .

[42]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[43]  Nabil I. El-Sawalhi,et al.  Contributors to construction delays in Palestine , 2003 .

[44]  Frank Fugar,et al.  Delays in Building Construction Projects in Ghana , 2010 .

[45]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[46]  José M. Cardoso Teixeira,et al.  Dealing with cost and time in the Portuguese construction industry , 2007 .

[47]  Koleola Tunwase Odusami,et al.  Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria , 2010 .

[48]  Johnny Wong,et al.  Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects , 2010 .

[49]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[50]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[51]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[52]  Yaser Abdullah Al-Juwairah Factors affecting construction costs in Saudi Arabia , 1997 .

[53]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[54]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[55]  James E. Diekmann,et al.  Concurrent delays in construction projects , 1987 .