Structural equations modelling for relational analysis of JIT performance in maquiladora sector

This paper analyses the process of implementing a just-in-time (JIT) methodology in maquiladora assembly plants in Mexico, through 20 activities undertaken in the areas of administration, supervision and production. The proposed approach uses a factor analysis of each group of variables (validating their feasibility through an analysis of the correlation matrix) by sections, activities and benefits obtained. A structural equations model is proposed to show how key factors in the success of the implementation of JIT associated with productive activities interrelate with factors linked to benefits. The results forthcoming from the study show that the benefits obtained through the proper administration by senior managers of their powers are directly reflected in the plant’s productivity indices, such as increases in output, quality and the operational flexibility of production systems. Furthermore, a good relationship with and management of suppliers guarantees an acceptable level of control over inventories, regarding both work in process and the end product, and likewise impact upon productivity indices.

[1]  Marshall Godwin,et al.  Health measurement scales , 1991 .

[2]  M. Browne,et al.  Single Sample Cross-Validation Indices for Covariance Structures. , 1989, Multivariate behavioral research.

[3]  Kenneth A. Bollen,et al.  Some Properties of Hoelter's CN , 1988 .

[4]  Hossein Sharifi,et al.  An empirical study of firm’s absorptive capacity dimensions, supplier involvement and new product development performance , 2013 .

[5]  Anand Nair,et al.  Relationship between just-in-time manufacturing practices and performance: A meta-analytic investigation , 2010 .

[6]  M. G. Pereira,et al.  [Adaptation of the sleep apnea quality of life index (SAQLI) to Portuguese obstructive sleep apnea syndrome patients]. , 2012, Revista portuguesa de pneumologia.

[7]  J. S. Tanaka,et al.  A fit index for covariance structure models under arbitrary GLS estimation , 1985 .

[8]  Tarun Gupta,et al.  JIT and TQM: a case for joint implementation , 1995 .

[9]  Richard J. Schonberger,et al.  The Japanese just-in-time/total quality control production system: potential for developing countries , 1984 .

[10]  Mark E. Ferguson,et al.  PRODUCTION AND OPERATIONS MANAGEMENT , 2008 .

[11]  Mahmoud M. Yasin,et al.  Organizational modifications to support JIT implementation in manufacturing and service operations , 2003 .

[12]  K. Jöreskog A general method for analysis of covariance structures , 1970 .

[13]  Yoshiki Matsui,et al.  An empirical analysis of just-in-time production in Japanese manufacturing companies , 2007 .

[14]  N. Suresh,et al.  An impact of manufacturing flexibility and technological dimensions of manufacturing strategy on improving supply chain responsiveness: Business environment perspective , 2013 .

[15]  Peter T. Ward,et al.  Lean manufacturing: context, practice bundles, and performance , 2003 .

[16]  Andrea Vinelli,et al.  Interrelationships among lean bundles and their effects on operational performance , 2008 .

[17]  N. Naresh,et al.  Structure, ac conductivity and complex impedance study of Co 3 O 4 and Fe 3 O 4 mixed spinel ferrites , 2011 .

[18]  José Antonio Domínguez Machuca JIT facing the New Millennium , 2002 .

[19]  S. Vinodh,et al.  Structural Equation Modelling of lean manufacturing practices , 2012 .

[20]  Roger G. Schroeder,et al.  A FRAMEWORK AND MEASUREMENT INSTRUMENT FOR JUST‐IN‐TIME MANUFACTURING , 1993 .

[21]  Harold Gulliksen,et al.  Reliability for the law of comparative judgment , 1958 .

[22]  T. Arthanari,et al.  Supply chain and operations practice and performance in Chinese furniture manufacturing , 2008 .

[23]  C. Carter,et al.  JIT purchasing and performance: an exploratory analysis of buyer and supplier perspectives , 2001 .

[24]  Rosemary R. Fullerton,et al.  Management accounting and control practices in a lean manufacturing environment , 2013 .

[25]  R. P. McDonald,et al.  Choosing a multivariate model: Noncentrality and goodness of fit. , 1990 .

[26]  Karl G. Jöreskog,et al.  Lisrel 8: User's Reference Guide , 1997 .

[27]  H. Neudecker,et al.  A matrix equality useful in goodness-of-fit testing of structural equation models , 2003 .

[28]  Dixit Garg,et al.  JIT purchasing: Literature review and implications for Indian industry , 1999 .

[29]  Improvement of the quality of the chi-square approximation for the ADF test on a covariance matrix w , 2011 .

[30]  Christopher A. Voss,et al.  Application of Just‐in‐Time Manufacturing Techniques in the United Kingdom , 1987 .

[31]  Sam Anand,et al.  A multivariate statistical analysis of sampling uncertainties in geometric and dimensional errors for circular features , 2006 .

[32]  A. Irizarry-Irizarry Development and validation of a questionnaire about the attitude and exposure of aged-Puerto Ricans to abuse and neglect. , 2008, Puerto Rico health sciences journal.

[33]  S. Koh,et al.  A casual analysis of the impact of information systems and supply chain management practices on operational performance : evidence from manufacturing SMEs in Turkey , 2009 .

[34]  Horst Wildemann Just-in-time production in West Germany , 1988 .

[35]  J. H. Steiger Statistically based tests for the number of common factors , 1980 .

[36]  Hanbin Xiao,et al.  Evaluation of the relevance measure between ports and regional economy using structural equation modeling , 2013 .

[37]  P. Barrett Structural equation modelling : Adjudging model fit , 2007 .

[38]  Ralf Dresner,et al.  Health Measurement Scales A Practical Guide To Their Development And Use , 2016 .

[39]  Vikas Kumar JIT Based Quality Management: Concepts and Implications in Indian Context , 2010 .

[40]  David. Proverbs,et al.  A systematic modelling and simulation approach for JIT performance optimisation , 2008 .

[41]  Seyed‐Mahmoud Aghazadeh JIT inventory and competition in the global environment: a comparative study of American and Japanese values in auto endustry , 2003 .

[42]  S. Vinodh,et al.  Estimation of reliability and validity of agility constructs using structural equation modelling , 2012 .

[43]  Michael J. Shaw,et al.  An empirical investigation of the impacts of internal/external facilitators on the project success of ERP: A structural equation model , 2011, Decis. Support Syst..

[44]  John Bicheno,et al.  Expert Advice for JIT Implementation , 1993 .

[45]  Jean Pierre Lévy Mangin,et al.  Analisis Multivariable Para Las Ciencias Sociales , 2003 .

[46]  R. A. Inman,et al.  Agile manufacturing: Relation to JIT, operational performance and firm performance , 2011 .

[47]  X. Koufteros Testing a model of pull production: a paradigm for manufacturing research using structural equation modeling , 1999 .

[48]  P. Bentler,et al.  Comparative fit indexes in structural models. , 1990, Psychological bulletin.

[49]  D. Darling,et al.  A Test of Goodness of Fit , 1954 .

[50]  R. Schroeder,et al.  The impact of total productive maintenance practices on manufacturing performance , 2001 .

[51]  K. G. Jöreskog,et al.  A GENERAL METHOD FOR ANALYSIS OF COVARIANCE STRUCTURES WITH APPLICATIONS: PART I: GENERAL METHODOLOGY* , 1969 .

[52]  L. Cronbach Coefficient alpha and the internal structure of tests , 1951 .

[53]  Pietro Romano,et al.  Assessing the impact of just-in-time on operational performance at varying degrees of repetitiveness , 2013 .

[54]  Lourens J. Waldorp,et al.  Goodness-of-fit and confidence intervals of approximate models , 2006 .

[55]  René Gélinas The Just-In-Time implementation project , 1999 .

[56]  R. Anthony Inman,et al.  Determining the Critical Elements of Just-In-Time Implementation , 1992 .

[57]  Michael P. Hottenstein,et al.  The relationship between JIT manufacturing and performance in Mexican plants affiliated with U.S. companies , 1995 .

[58]  Zoran Perunovic,et al.  Impact of information technology on vendor objectives, capabilities, and competences in contract electronic manufacturing , 2012 .

[59]  W. G. Cochran The $\chi^2$ Test of Goodness of Fit , 1952 .

[60]  Chyan Yang,et al.  A structural equation model for analyzing the impact of ERP on SCM , 2010, Expert Syst. Appl..

[61]  Peter Arras Benefits and problems of CAM-implementation , 2000 .

[62]  E. Carmines,et al.  Analyzing models with unobserved variables: analysis of covariance structures , 1981 .

[63]  Esther P. Y. Tang,et al.  Analysis of sources of innovation, technological innovation capabilities, and performance: An empirical study of Hong Kong manufacturing industries , 2011 .

[64]  K. Pearson On the χ 2 Test of Goodness of Fit , 1922 .

[65]  Roger G. Schroeder,et al.  THE ROLE OF INFRASTRUCTURE PRACTICES IN THE EFFECTIVENESS OF JIT PRACTICES: IMPLICATIONS FOR PLANT COMPETITIVENESS , 2003 .

[66]  Ab Mooijaart,et al.  On Insensitivity of the Chi-Square Model Test to Nonlinear Misspecification in Structural Equation Models , 2008 .

[67]  Roger G. Schroeder,et al.  The relationships among functional integration, mass customisation, and firm performance , 2012 .

[68]  Pankaj C. Patel,et al.  Enhancing effects of manufacturing flexibility through operational absorptive capacity and operational ambidexterity , 2012 .

[69]  K. Jöreskog A general approach to confirmatory maximum likelihood factor analysis , 1969 .

[70]  Soo Wook Kim,et al.  Manufacturing Practices and Strategy Integration: Effects on Cost Efficiency, Flexibility, and Market-Based Performance , 2005, Decis. Sci..

[71]  Qing Cao,et al.  Production, Manufacturing and Logistics The relationships among virtual enterprise, information technology, and business performance in agile manufacturing: An industry perspective , 2006 .

[72]  M. Martínez-García,et al.  Internal consistency and validity of the Spanish version of the quality of life questionnaire specific for obstructive sleep apnea: sleep apnea quality of life index. , 2012, Archivos de bronconeumologia.

[73]  Roger G. Schroeder,et al.  The Impact of Quality Management Practices on Performance and Competitive Advantage , 1995 .

[74]  Sandeep Malik,et al.  JIT BASED QUALITY MANAGEMENT IN INDIAN INDUSTRIES , 2011 .

[75]  R. Peterson A Meta-analysis of Cronbach's Coefficient Alpha , 1994 .

[76]  B. Muthén,et al.  Assessing Reliability and Stability in Panel Models , 1977 .

[77]  Hojung Shin,et al.  TQM practice in maquiladora: Antecedents of employee satisfaction and loyalty , 2006 .

[78]  S. Snell,et al.  THE STRATEGIC USE OF INTEGRATED MANUFACTURING: AN EMPIRICAL EXAMINATION , 1996 .

[79]  Dixit Garg,et al.  JIT practices in Indian context: A survey , 2004 .

[80]  Yoram Koren,et al.  The Global Manufacturing Revolution: Product-Process-Business Integration and Reconfigurable Systems , 2010 .

[81]  Horst W. Hamacher,et al.  Scheduling two agents on uniform parallel machines with makespan and cost functions , 2011, J. Sched..

[82]  J. Hoelter The Analysis of Covariance Structures , 1983 .

[83]  A. Goldberger,et al.  Estimation of a Model with Multiple Indicators and Multiple Causes of a Single Latent Variable , 1975 .

[84]  T. Alkın,et al.  The validity and reliability of Turkish version of separation anxiety symptom inventory and adult separation anxiety questionnaire. , 2012, Turk psikiyatri dergisi = Turkish journal of psychiatry.

[85]  J. Nunnally Psychometric Theory (2nd ed), New York: McGraw-Hill. , 1978 .

[86]  Christopher Voss Just-in-time manufacture , 1987 .

[87]  Pietro Romano,et al.  JIT-production, JIT-supply and performance: investigating the moderating effects , 2012, Ind. Manag. Data Syst..

[88]  H. Marsh,et al.  Application of confirmatory factor analysis to the study of self-concept: First- and higher order factor models and their invariance across groups. , 1985 .

[89]  E. Martínez,et al.  Applicability of lean production with VSM to the Rioja wine sector , 2012 .

[90]  Rachna Shah,et al.  Defining and developing measures of lean production , 2007 .

[91]  P. Swamidass,et al.  Matching plant flexibility and supplier flexibility: Lessons from small suppliers of U.S. manufacturing plants in India , 2007 .