Integration of BIM and GIS: Highway Cut and Fill Earthwork Balancing
暂无分享,去创建一个
[1] A. Hilmi Lav,et al. Method for Balancing Cut-Fill and Minimizing the Amount of Earthwork in the Geometric Design of Highways , 2003 .
[2] Myung Jin Chae,et al. 3D Work Environment Modeling for the Intelligent Excavation System (IES) , 2009 .
[3] Jing Chen,et al. Emergy evaluation perspectives of an irrigation improvement project proposal in China , 2011 .
[4] Khaled Nassar,et al. Developing an efficient algorithm for balancing mass-haul diagrams , 2011 .
[5] Warren Hare,et al. Models and algorithms to improve earthwork operations in road design using mixed integer linear programming , 2011, Eur. J. Oper. Res..
[6] Javier Irizarry,et al. Developing a Spatial Data Framework for Facility Management Supply Chains , 2014 .
[7] Jianyong Shi,et al. An Agent-Based Evacuation Model to Support Fire Safety Design Based on an Integrated 3D GIS and BIM Platform , 2014 .
[8] Chimay J. Anumba,et al. Evaluation of IFC4 for the GIS and Green Building Domains , 2014 .
[9] James H. Banks. Introduction to Transportation Engineering , 1997 .
[10] Javier Irizarry,et al. Integrating BIM and GIS to improve the visual monitoring of construction supply chain management , 2013 .
[11] Tomoaki Shitani,et al. A Management System for Cut and Fill Earthworks Based on 4D CAD and EVMS , 2005 .
[12] Kevin Orr,et al. Highway Alignment Construction Comparison Using Object-Oriented 3D Visualization Modeling , 2014 .
[13] Paul Schonfeld,et al. Highway Alignment Optimization Incorporating Bridges and Tunnels , 2007 .