Integration of BIM and GIS: Highway Cut and Fill Earthwork Balancing

The proposed paper intends to provide a technical review between Building Information Modeling (BIM) and Geographic Information System (GIS) and measure the different strengths and weaknesses of each approach. Then, the proposed project aims to present a newly developed data integration approach in facilitating the continuous work processes of the two distinct environments. This research utilizes BIM based (IFC) system to store road components data in highway construction and then GIS system to import data such as land boundaries, and topographic data. In order to retrieve and integrate the two distinct types of data formats, this research uses the concept of semantic web in Resource Description Framework (RDF) format to provide semantic interoperability between BIM and GIS operations.

[1]  A. Hilmi Lav,et al.  Method for Balancing Cut-Fill and Minimizing the Amount of Earthwork in the Geometric Design of Highways , 2003 .

[2]  Myung Jin Chae,et al.  3D Work Environment Modeling for the Intelligent Excavation System (IES) , 2009 .

[3]  Jing Chen,et al.  Emergy evaluation perspectives of an irrigation improvement project proposal in China , 2011 .

[4]  Khaled Nassar,et al.  Developing an efficient algorithm for balancing mass-haul diagrams , 2011 .

[5]  Warren Hare,et al.  Models and algorithms to improve earthwork operations in road design using mixed integer linear programming , 2011, Eur. J. Oper. Res..

[6]  Javier Irizarry,et al.  Developing a Spatial Data Framework for Facility Management Supply Chains , 2014 .

[7]  Jianyong Shi,et al.  An Agent-Based Evacuation Model to Support Fire Safety Design Based on an Integrated 3D GIS and BIM Platform , 2014 .

[8]  Chimay J. Anumba,et al.  Evaluation of IFC4 for the GIS and Green Building Domains , 2014 .

[9]  James H. Banks Introduction to Transportation Engineering , 1997 .

[10]  Javier Irizarry,et al.  Integrating BIM and GIS to improve the visual monitoring of construction supply chain management , 2013 .

[11]  Tomoaki Shitani,et al.  A Management System for Cut and Fill Earthworks Based on 4D CAD and EVMS , 2005 .

[12]  Kevin Orr,et al.  Highway Alignment Construction Comparison Using Object-Oriented 3D Visualization Modeling , 2014 .

[13]  Paul Schonfeld,et al.  Highway Alignment Optimization Incorporating Bridges and Tunnels , 2007 .