Integrated supply chain model for a deteriorating item with procurement cost dependent credit period

This study develops an integrated production inventory model of supplier and retailer where a delay in payment is offered by supplier to retailer for a constant deteriorating item. Here shortages are not allowed. In this model retailer's procurement cost linearly depends on the credit period and supplier's process cost also is a linear function of the amount of quantity purchased by retailer. In this model, the objective is to decide the position of the credit period and number of replenishment of retailer in finite time horizon in such a way that the integrated system gets the optimum cost. The model is explained with the help of numerical examples and the sensitivity analysis of some parameters are also carried out.

[1]  Mohamad Y. Jaber,et al.  Coordinating a two-level supply chain with delay in payments and profit sharing , 2006, Comput. Ind. Eng..

[2]  Kun-Jen Chung The Inventory Replenishment Policy for Deteriorating Items Under Permissible Delay in Payments , 2000 .

[3]  Liang-Hsuan Chen,et al.  Integrated inventory models considering permissible delay in payment and variant pricing strategy , 2010 .

[4]  B. Sarker,et al.  An ordering policy for deteriorating items with allowable shortage and permissible delay in payment , 1997 .

[5]  R. Misra,et al.  Optimum production lot size model for a system with deteriorating inventory , 1975 .

[6]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[7]  Bhaba R. Sarker,et al.  Optimal payment time under permissible delay in payment for products with deterioration , 2000 .

[8]  Bhaba R. Sarker,et al.  Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon , 2010 .

[9]  Yung-Fu Huang,et al.  Optimal retailer's replenishment policy for the EPQ model under the supplier's trade credit policy , 2004 .

[10]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[11]  Mohamad Y. Jaber,et al.  Lot sizing with permissible delay in payments and entropy cost , 2007, Comput. Ind. Eng..

[12]  P. C. Yang,et al.  Production , Manufacturing and Logistics Pricing strategy for deteriorating items using quantity discount when demand is price sensitive , 2004 .

[13]  L. Ouyang,et al.  Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .

[14]  Kheng Joo Heng,et al.  An order-level lot-size inventory model for deteriorating items with finite replenishment rate , 1991 .

[15]  S. Goyal Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .

[16]  P. C. Yang,et al.  Global optimal policy for vendor–buyer integrated inventory system within just in time environment , 2007, J. Glob. Optim..

[17]  Amiya K. Chakravarty,et al.  An optimal joint buyer-seller discount pricing model , 1988, Comput. Oper. Res..

[18]  Barun Das,et al.  A two warehouse supply-chain model under possibility/ necessity/credibility measures , 2007, Math. Comput. Model..

[19]  Peter Chu,et al.  Economic order quantity of deteriorating items under permissible delay in payments , 1998, Comput. Oper. Res..

[20]  Y. K. Shah An Order-Level Lot-Size Inventory Model for Deteriorating Items , 1977 .

[21]  B. Sarker,et al.  Optimal payment time for a retailer under permitted delay of payment by the wholesaler , 2000 .

[22]  Chao-Kuei Huang An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration , 2004 .

[23]  Seung-Lae Kim,et al.  Implementation of JIT purchasing: An integrated approach , 1997 .

[24]  Jason Chao-Hsien Pan,et al.  A study of an integrated inventory with controllable lead time , 2002 .

[25]  Saoussen Krichen,et al.  Single supplier multiple cooperative retailers inventory model with quantity discount and permissible delay in payments , 2011, Comput. Ind. Eng..

[26]  S. Aggarwal,et al.  Ordering Policies of Deteriorating Items under Permissible Delay in Payments , 1995 .

[27]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .