Integrated supply chain model for a deteriorating item with procurement cost dependent credit period
暂无分享,去创建一个
[1] Mohamad Y. Jaber,et al. Coordinating a two-level supply chain with delay in payments and profit sharing , 2006, Comput. Ind. Eng..
[2] Kun-Jen Chung. The Inventory Replenishment Policy for Deteriorating Items Under Permissible Delay in Payments , 2000 .
[3] Liang-Hsuan Chen,et al. Integrated inventory models considering permissible delay in payment and variant pricing strategy , 2010 .
[4] B. Sarker,et al. An ordering policy for deteriorating items with allowable shortage and permissible delay in payment , 1997 .
[5] R. Misra,et al. Optimum production lot size model for a system with deteriorating inventory , 1975 .
[6] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[7] Bhaba R. Sarker,et al. Optimal payment time under permissible delay in payment for products with deterioration , 2000 .
[8] Bhaba R. Sarker,et al. Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon , 2010 .
[9] Yung-Fu Huang,et al. Optimal retailer's replenishment policy for the EPQ model under the supplier's trade credit policy , 2004 .
[10] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[11] Mohamad Y. Jaber,et al. Lot sizing with permissible delay in payments and entropy cost , 2007, Comput. Ind. Eng..
[12] P. C. Yang,et al. Production , Manufacturing and Logistics Pricing strategy for deteriorating items using quantity discount when demand is price sensitive , 2004 .
[13] L. Ouyang,et al. Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .
[14] Kheng Joo Heng,et al. An order-level lot-size inventory model for deteriorating items with finite replenishment rate , 1991 .
[15] S. Goyal. Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .
[16] P. C. Yang,et al. Global optimal policy for vendor–buyer integrated inventory system within just in time environment , 2007, J. Glob. Optim..
[17] Amiya K. Chakravarty,et al. An optimal joint buyer-seller discount pricing model , 1988, Comput. Oper. Res..
[18] Barun Das,et al. A two warehouse supply-chain model under possibility/ necessity/credibility measures , 2007, Math. Comput. Model..
[19] Peter Chu,et al. Economic order quantity of deteriorating items under permissible delay in payments , 1998, Comput. Oper. Res..
[20] Y. K. Shah. An Order-Level Lot-Size Inventory Model for Deteriorating Items , 1977 .
[21] B. Sarker,et al. Optimal payment time for a retailer under permitted delay of payment by the wholesaler , 2000 .
[22] Chao-Kuei Huang. An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration , 2004 .
[23] Seung-Lae Kim,et al. Implementation of JIT purchasing: An integrated approach , 1997 .
[24] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[25] Saoussen Krichen,et al. Single supplier multiple cooperative retailers inventory model with quantity discount and permissible delay in payments , 2011, Comput. Ind. Eng..
[26] S. Aggarwal,et al. Ordering Policies of Deteriorating Items under Permissible Delay in Payments , 1995 .
[27] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .