A Multi-Objective Train Operational Plan Optimization Approach for Adding Additional Trains on a High-Speed Railway Corridor in Peak Periods
暂无分享,去创建一个
[1] Yu Qiao,et al. Comprehensive optimization of urban rail transit timetable by minimizing total travel times under time-dependent passenger demand and congested conditions , 2018 .
[2] Ziyou Gao,et al. Three-stage optimization method for the problem of scheduling additional trains on a high-speed rail corridor , 2017, Omega.
[3] Matteo Fischetti,et al. Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..
[4] Paolo Toth,et al. A Lagrangian heuristic algorithm for a real-world train timetabling problem , 2006, Discret. Appl. Math..
[5] Leo G. Kroon,et al. On solving multi-type railway line planning problems , 2006, Eur. J. Oper. Res..
[6] Erhan Kozan,et al. Optimal scheduling of trains on a single line track , 1996 .
[7] Lixing Yang,et al. Integrated optimization for train operation zone and stop plan with passenger distributions , 2018 .
[8] Pei Liu,et al. Joint optimization model for train scheduling and train stop planning with passengers distribution on railway corridors , 2018, J. Oper. Res. Soc..
[9] Chung-Hsing Yeh,et al. A Multiobjective Model for Passenger Train Services Planning: Application to Taiwan's High-Speed Rail Line , 2000 .
[10] Shadi Sharif Azadeh,et al. Train timetable design under elastic passenger demand , 2018 .
[11] Dario Pacciarelli,et al. Assessment of flexible timetables in real-time traffic management of a railway bottleneck , 2008 .
[12] Erhan Kozan,et al. Modeling Train Delays in Urban Networks , 1998, Transp. Sci..
[13] Shaoquan Ni,et al. High-Speed Train Stop-Schedule Optimization Based on Passenger Travel Convenience , 2016 .
[14] Huiling Fu,et al. Operational Impacts of Using Restricted Passenger Flow Assignment in High-Speed Train Stop Scheduling Problem , 2013 .
[15] Paolo Toth,et al. Scheduling extra freight trains on railway networks , 2010 .
[16] Paolo Toth,et al. Chapter 3 Passenger Railway Optimization , 2007, Transportation.
[17] Ismail Sahin,et al. Railway traffic control and train scheduling based oninter-train conflict management , 1999 .
[18] Chengxuan Cao,et al. A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period , 2020 .
[19] David Canca,et al. Design and analysis of demand-adapted railway timetables , 2013 .
[20] Nico M. van Dijk,et al. Cost optimal allocation of rail passenger lines , 1998, Eur. J. Oper. Res..
[21] Erhan Kozan,et al. Techniques for inserting additional trains into existing timetables , 2009 .
[22] Leo G. Kroon,et al. A Branch-and-Cut Approach for Solving Railway Line-Planning Problems , 2004, Transp. Sci..
[23] Gilbert Laporte,et al. Single-line rail rapid transit timetabling under dynamic passenger demand , 2014 .
[24] Lixing Yang,et al. Collaborative optimization for train scheduling and train stop planning on high-speed railways , 2016 .
[25] P. Kreuzer,et al. Optimal lines for railway systems , 1997 .
[26] Kay W. Axhausen,et al. Demand-driven timetable design for metro services , 2014 .