A Multi-Objective Train Operational Plan Optimization Approach for Adding Additional Trains on a High-Speed Railway Corridor in Peak Periods

[1]  Yu Qiao,et al.  Comprehensive optimization of urban rail transit timetable by minimizing total travel times under time-dependent passenger demand and congested conditions , 2018 .

[2]  Ziyou Gao,et al.  Three-stage optimization method for the problem of scheduling additional trains on a high-speed rail corridor , 2017, Omega.

[3]  Matteo Fischetti,et al.  Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..

[4]  Paolo Toth,et al.  A Lagrangian heuristic algorithm for a real-world train timetabling problem , 2006, Discret. Appl. Math..

[5]  Leo G. Kroon,et al.  On solving multi-type railway line planning problems , 2006, Eur. J. Oper. Res..

[6]  Erhan Kozan,et al.  Optimal scheduling of trains on a single line track , 1996 .

[7]  Lixing Yang,et al.  Integrated optimization for train operation zone and stop plan with passenger distributions , 2018 .

[8]  Pei Liu,et al.  Joint optimization model for train scheduling and train stop planning with passengers distribution on railway corridors , 2018, J. Oper. Res. Soc..

[9]  Chung-Hsing Yeh,et al.  A Multiobjective Model for Passenger Train Services Planning: Application to Taiwan's High-Speed Rail Line , 2000 .

[10]  Shadi Sharif Azadeh,et al.  Train timetable design under elastic passenger demand , 2018 .

[11]  Dario Pacciarelli,et al.  Assessment of flexible timetables in real-time traffic management of a railway bottleneck , 2008 .

[12]  Erhan Kozan,et al.  Modeling Train Delays in Urban Networks , 1998, Transp. Sci..

[13]  Shaoquan Ni,et al.  High-Speed Train Stop-Schedule Optimization Based on Passenger Travel Convenience , 2016 .

[14]  Huiling Fu,et al.  Operational Impacts of Using Restricted Passenger Flow Assignment in High-Speed Train Stop Scheduling Problem , 2013 .

[15]  Paolo Toth,et al.  Scheduling extra freight trains on railway networks , 2010 .

[16]  Paolo Toth,et al.  Chapter 3 Passenger Railway Optimization , 2007, Transportation.

[17]  Ismail Sahin,et al.  Railway traffic control and train scheduling based oninter-train conflict management , 1999 .

[18]  Chengxuan Cao,et al.  A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period , 2020 .

[19]  David Canca,et al.  Design and analysis of demand-adapted railway timetables , 2013 .

[20]  Nico M. van Dijk,et al.  Cost optimal allocation of rail passenger lines , 1998, Eur. J. Oper. Res..

[21]  Erhan Kozan,et al.  Techniques for inserting additional trains into existing timetables , 2009 .

[22]  Leo G. Kroon,et al.  A Branch-and-Cut Approach for Solving Railway Line-Planning Problems , 2004, Transp. Sci..

[23]  Gilbert Laporte,et al.  Single-line rail rapid transit timetabling under dynamic passenger demand , 2014 .

[24]  Lixing Yang,et al.  Collaborative optimization for train scheduling and train stop planning on high-speed railways , 2016 .

[25]  P. Kreuzer,et al.  Optimal lines for railway systems , 1997 .

[26]  Kay W. Axhausen,et al.  Demand-driven timetable design for metro services , 2014 .